GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

18 CFR 153.5: Who shall apply.

Read at publisher ↗
Where this section sits in the code
  1. Title 18—Conservation of Power and Water Resources
  2. CHAPTER I—FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY
  3. SUBCHAPTER E—REGULATIONS UNDER NATURAL GAS ACT
  4. PART 153—APPLICATIONS FOR AUTHORIZATION TO CONSTRUCT, OPERATE, OR MODIFY FACILITIES USED FOR THE EXPORT OR IMPORT OF NATURAL GAS
  5. Subpart B—Application Under Section 3

(a) Applicant. Any person proposing to site, construct, or operate facilities which are to be used for the export of natural gas from the United States to a foreign country or for the import of natural gas from a foreign country or to amend an existing Commission authorization, including the modification of existing authorized facilities, shall file with the Commission an application for authorization therefor under subpart B of this part and section 3 of the Natural Gas Act.

(b) Cross-reference. Any person applying under paragraph (a) of this section to construct facilities at the borders of the United States and Canada or Mexico must also simultaneously apply for a Presidential Permit under subpart C of this part.

Collected 2026-08-27T02:24:34Z. Source file · JSON

Browse this collection