23 CFR 630.402: Policy.

Read at publisher ↗
Where this section sits in the code
  1. Title 23—Highways
  2. CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION
  3. SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS
  4. PART 630—PRECONSTRUCTION PROCEDURES
  5. Subpart D—Geodetic Markers

(a) Geodetic surveys along Federal-aid highway routes may be programmed as Federal-aid highway projects.

(b) All geodetic survey work performed as a Federal-aid highway project will conform to National Ocean Survey (NOS) specifications. NOS will, as the representative of FHWA, be responsible for the inspection and verification of the work to ascertain that the specifications for the work have been met. Final project acceptance by FHWA will be predicated on a finding of acceptability by NOS.