25 CFR 169.127: Is a new right-of-way grant required for a new use within or overlapping an existing right-of-way?
Where this section sits in the code
- Title 25—Indians
- CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER H—LAND AND WATER
- PART 169—RIGHTS-OF-WAY OVER INDIAN LAND
- Subpart C—Obtaining a Right-of-Way
(a) If you are the grantee, you may use all or a portion of an existing right-of-way for a use not specified in the original grant of the existing right-of-way only if it is within the same scope of the use specified in the original grant of the existing right-of-way.
(1) If you propose to use all or a portion of an existing right-of-way for a use not specified in the original grant of the existing right-of-way and not within the same scope of the use specified in the original grant of the existing right-of-way, and the new use will not require any ground disturbance, you must request an amendment to the existing right-of-way grant.
(2) If you propose to use all or a portion of an existing right-of-way for a use not specified in the original grant of the existing right-of-way and not within the same scope of the use specified in the original grant of the existing right-of-way, and the new use requires ground disturbance, you must request a new right-of-way.
(b) If you are not the grantee:
(1) You may use all or a portion of an existing right-of-way for a use specified in the original grant of the existing right-of-way or a use within the same scope of the use specified in the original grant of the existing right-of-way if the grantee obtains an assignment to authorize the new user; or
(2) You may use all or a portion of an existing right-of-way for a use not specified in the original grant of the existing right-of-way and not within the same scope of use specified in the original grant of the existing right-of-way if you request a new right-of-way within or overlapping the existing right-of-way for the new use.
(c) An example of a use within the same scope is a right-of-way for underground telephone line being used for an underground fiber optic line, and an example of a use that is not within the same scope is a right-of-way for a pipeline being used for a road or railroad.
Collected 2026-08-27T02:24:59Z. Source file · JSON