GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

25 CFR 173.18: Term and renewal of permits.

Read at publisher ↗
Where this section sits in the code
  1. Title 25—Indians
  2. CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR
  3. SUBCHAPTER H—LAND AND WATER
  4. PART 173—CONCESSIONS, PERMITS AND LEASES ON LANDS WITHDRAWN OR ACQUIRED IN CONNECTION WITH INDIAN IRRIGATION PROJECTS

No concession granted under the provisions of this part shall extend for a period in excess of 10 years. An application for the renewal of a lease, permit, or concession permit shall be treated in the same manner as an original application under this part. Should there be an application or applications other than the renewal application for a permit covering the same area, the renewal application may, if the applicant has met all the requirements of the expiring permit and has been a satisfactory permittee, be given preferential consideration for the renewal of the permit should the applicant meet the highest and most satisfactory offer contained in the several applications.

Collected 2026-08-27T02:24:59Z. Source file · JSON

Browse this collection