GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

29 CFR 1926.604: Site clearing.

Read at publisher ↗
Where this section sits in the code
  1. Title 29—Labor
  2. Subtitle B—Regulations Relating to Labor
  3. CHAPTER XVII—OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
  4. PART 1926—SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION
  5. Subpart O—Motor Vehicles, Mechanized Equipment, and Marine Operations

(a) General requirements. (1) Employees engaged in site clearing shall be protected from hazards of irritant and toxic plants and suitably instructed in the first aid treatment available.

(2) All equipment used in site clearing operations shall be equipped with rollover guards meeting the requirements of this subpart. In addition, rider-operated equipment shall be equipped with an overhead and rear canopy guard meeting the following requirements:

(i) The overhead covering on this canopy structure shall be of not less than 1/8-inch steel plate or 1/4-inch woven wire mesh with openings no greater than 1 inch, or equivalent.

(ii) The opening in the rear of the canopy structure shall be covered with not less than 1/4-inch woven wire mesh with openings no greater than 1 inch.

(b) Specific requirements. [Reserved]

Collected 2026-08-27T02:25:20Z. Source file · JSON

Browse this collection