30 CFR 250.841: Platforms.
Where this section sits in the code
- Title 30—Mineral Resources
- CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER B—OFFSHORE
- PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
- Subpart H—Oil and Gas Production Safety Systems
(a) You must protect all platform production facilities with a basic and ancillary surface safety system designed, analyzed, installed, tested, and maintained in operating condition in accordance with the provisions of Recommended Practice 14C (incorporated by reference, see § 250.198). If you use processing components other than those for which Safety Analysis Checklists are included in Recommended Practice 14C, you must utilize the analysis technique and documentation specified in Recommended Practice 14C to determine the effects and requirements of these components on the safety system. Safety device requirements for pipelines are contained in § 250.1004.
(b) You must design, install, inspect, repair, test, and maintain in operating condition all platform production process piping in accordance with Recommended Practice 14E and API 570 (both incorporated by reference, see § 250.198). The District Manager may approve temporary repairs to facility piping on a case-by-case basis for a period not to exceed 30 days.
(c) If you plan to make a modification to any production safety system that also involves a major modification to the platform structure, you must follow the requirements in § 250.900(b)(2). A major modification to a platform structure is defined in § 250.900(b)(2).