30 CFR 56.12042: Track bonding.
Where this section sits in the code
- Title 30—Mineral Resources
- CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
- SUBCHAPTER K—METAL AND NONMETAL MINE SAFETY AND HEALTH
- PART 56—SAFETY AND HEALTH STANDARDS—SURFACE METAL AND NONMETAL MINES
- Subpart K—Electricity
Both rails shall be bonded or welded at every joint and rails shall be crossbonded at least every 200 feet if the track serves as the return trolley circuit. When rails are moved, replaced, or broken bonds are discovered, they shall be rebonded within three working shifts.
Collected 2026-08-27T02:25:24Z. Source file · JSON