GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

30 CFR 56.6307: Drill stem loading.

Read at publisher ↗
Where this section sits in the code
  1. Title 30—Mineral Resources
  2. CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
  3. SUBCHAPTER K—METAL AND NONMETAL MINE SAFETY AND HEALTH
  4. PART 56—SAFETY AND HEALTH STANDARDS—SURFACE METAL AND NONMETAL MINES
  5. Subpart E—Explosives

Explosive material shall not be loaded into blastholes with drill stem equipment or other devices that could be extracted while containing explosive material. The use of loading hose, collar sleeves, or collar pipes is permitted.

Collected 2026-08-27T02:25:24Z. Source file · JSON

Browse this collection