GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

30 CFR 57.19022: Initial measurement.

Read at publisher ↗
Where this section sits in the code
  1. Title 30—Mineral Resources
  2. CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
  3. SUBCHAPTER K—METAL AND NONMETAL MINE SAFETY AND HEALTH
  4. PART 57—SAFETY AND HEALTH STANDARDS—UNDERGROUND METAL AND NONMETAL MINES
  5. Subpart R—Personnel Hoisting

After initial rope stretch but before visible wear occurs, the rope diameter of newly installed wire ropes shall be measured at least once in every third interval of active length and the measurements averaged to establish a baseline for subsequent measurements. A record of the measurements and the date shall be made by the person taking the measurements. This record shall be retained until the rope is retired from service.

Collected 2026-08-27T02:25:24Z. Source file · JSON

Browse this collection