GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

30 CFR 57.6600: Loading practices.

Read at publisher ↗
Where this section sits in the code
  1. Title 30—Mineral Resources
  2. CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
  3. SUBCHAPTER K—METAL AND NONMETAL MINE SAFETY AND HEALTH
  4. PART 57—SAFETY AND HEALTH STANDARDS—UNDERGROUND METAL AND NONMETAL MINES
  5. Subpart E—Explosives

If extraneous electricity is suspected in an area where electric detonators are used, loading shall be suspended until tests determine that stray current does not exceed 0.05 amperes through a 1-ohm resister when measured at the location of the electric detonators. If greater levels of extraneous electricity are found, the source shall be determined and no loading shall take place until the condition is corrected.

Collected 2026-08-27T02:25:24Z. Source file · JSON

Browse this collection