GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

30 CFR 75.800-3: -3 Testing, examination and maintenance of circuit breakers; procedures.

Read at publisher ↗
Where this section sits in the code
  1. Title 30—Mineral Resources
  2. CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
  3. SUBCHAPTER O—COAL MINE SAFETY AND HEALTH
  4. PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES
  5. Subpart I—Underground High-Voltage Distribution

(a) Circuit breakers and their auxiliary devices protecting underground high-voltage circuits shall be tested and examined at least once each month by a person qualified as provided in § 75.153;

(b) Tests shall include: (1) Breaking continuity of the ground check conductor, where ground check monitoring is used; and

(2) Actuating at least two (2) of the auxiliary protective relays.

(c) Examination shall include visual observation of all components of the circuit breaker and its auxiliary devices, and such repairs or adjustments as are indicated by such tests and examinations shall be carried out immediately.

Collected 2026-08-27T02:25:24Z. Source file · JSON

Browse this collection