GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

30 CFR 77.1005: Scaling highwalls; general.

Read at publisher ↗
Where this section sits in the code
  1. Title 30—Mineral Resources
  2. CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
  3. SUBCHAPTER O—COAL MINE SAFETY AND HEALTH
  4. PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES
  5. Subpart K—Ground Control

(a) Hazardous areas shall be scaled before any other work is performed in the hazardous area. When scaling of highwalls is necessary to correct conditions that are hazardous to persons in the area, a safe means shall be provided for performing such work.

(b) Whenever it becomes necessary for safety to remove hazardous material from highwalls by hand, the hazardous material shall be approached from a safe direction and the material removed from a safe location.

Collected 2026-08-27T02:25:24Z. Source file · JSON

Browse this collection