30 CFR 77.1432: Initial measurement.
Where this section sits in the code
- Title 30—Mineral Resources
- CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR
- SUBCHAPTER O—COAL MINE SAFETY AND HEALTH
- PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES
- Subpart O—Personnel Hoisting
After initial rope stretch but before visible wear occurs, the rope diameter of newly installed wire ropes shall be measured at least once in every third interval of active length and the measurements averaged to establish a baseline for subsequent measurements. A record of the measurements and the date shall be made by the person taking the measurements. This record shall be retained until the rope is retired from service.
Collected 2026-08-27T02:25:24Z. Source file · JSON