GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 117.155: Eureka Slough.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—BRIDGES
  4. PART 117—DRAWBRIDGE OPERATION REGULATIONS
  5. Subpart B—Specific Requirements

The drawspan for the Northwestern Pacific Railroad Authority Drawbridge, mile 0.3 at Eureka, need not be opened for the passage of vessels. The owner or agency controlling the drawbridge must restore the drawspan to full operation within six months of notification from the District Commander.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection