GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 117.525: Kennebec River.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—BRIDGES
  4. PART 117—DRAWBRIDGE OPERATION REGULATIONS
  5. Subpart B—Specific Requirements

The draw of the Carlton Bridge, mile 14.0, between Bath and Woolwich shall operate as follows:

(a) From May 15 through September 30 the draw shall open on signal; except that, from 5 p.m. to 8 a.m., the draw shall open on signal if a two-hour notice is given by calling the number posted at the bridge.

(b) From October 1 through May14 the draw shall open on signal; except that, from 5 p.m. to 8 a.m., the draw shall open on signal after a twenty-four hours notice is given from 8 a.m. to 5 p.m., on Saturday and Sunday, after an eight-hour notice is given by calling the number posted at the bridge.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection