33 CFR 117.565: Miles River.
Where this section sits in the code
- Title 33—Navigation and Navigable Waters
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER J—BRIDGES
- PART 117—DRAWBRIDGE OPERATION REGULATIONS
- Subpart B—Specific Requirements
The draw of the Route S370 bridge, mile 10.0 at Easton, Maryland, shall open on signal; except that from November 1 through March 31, 24 hours a day, and from April 1 through October 31, from 6 p.m. to 6 a.m., a six-hour advance notice to the drawtender is required for bridge openings.
Collected 2026-08-27T02:25:35Z. Source file · JSON