GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 117.686: Yazoo River.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—BRIDGES
  4. PART 117—DRAWBRIDGE OPERATION REGULATIONS
  5. Subpart B—Specific Requirements

(a) The Satartia highway (S433) bridge, mile 53.3 at Satartia, shall open on signal if at least two hours notice is given. When a vessel has given notice and fails to arrive within the two hour period specified, the drawtender shall remain on duty for two additional hours and open the draw if the requesting vessel appears. After this time, an additional two hour notice is required.

(b) The draws of the bridges upstream from the Satartia highway (S433) bridge shall open on signal if at least four hours notice is given. When a vessel has given notice and fails to arrive within the four hour period specified, the drawtender shall remain on duty for two additional hours and open the draw if the requesting vessel appears. After this time, an additional four hour notice is required.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection