GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 117.9: Delaying opening of a draw.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—BRIDGES
  4. PART 117—DRAWBRIDGE OPERATION REGULATIONS
  5. Subpart A—General Requirements

No person shall unreasonably delay the opening of a draw after the signals required by § 117.15 have been given.

Note:

Trains are usually controlled by the block method. That is, the track is divided into blocks or segments of a mile or more in length. When a train is in a block with a drawbridge, the draw may not be able to open until the train has passed out of the block and the yardmaster or other manager has “unlocked” the drawbridge controls. The maximum time permitted for delay is defined in Subpart B for each affected bridge. Land and water traffic should pass over or through the draw as soon as possible in order to prevent unnecessary delays in the opening and closure of the draw.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection