33 CFR 150.445: When is oil in a single point mooring-oil transfer system (SPM-OTS) displaced with water?

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER NN—DEEPWATER PORTS
  4. PART 150—DEEPWATER PORTS: OPERATIONS
  5. Subpart E—Cargo Transfer Operations

(a) The oil in an SPM-OTS must be displaced with water, and the valve at the pipeline end manifold must be closed whenever:

(1) A storm warning forecasts weather conditions that will exceed the design operating criteria listed in the operations manual for the SPM-OTS;

(2) A vessel is about to depart the SPM because of storm conditions; or

(3) The SPM is not scheduled for use in an oil transfer operation within the next 7 days.

(b) The requirement in paragraph (a) of this section is waived if port officials can demonstrate to the Sector Commander, or MSU Commander, with COTP and OCMI authority that a satisfactory alternative means of safely securing all cargo transfer hoses can be implemented in the event of severe weather conditions.