GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 154.2021: Operational review—owner/operator responsibilities.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER O—POLLUTION
  4. PART 154—FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
  5. Subpart P—Marine Vapor Control Systems

(a) Each facility vapor control system (VCS) must undergo an operational review by a certifying entity within five years of its initial certification or last operational review, to ensure its proper operation and maintenance.

(b) The VCS owner or operator must coordinate with the certifying entity and provide the entity with all necessary documentation and records to conduct the operational review.

(c) The VCS owner or operator must notify the Captain of the Port (COTP) of a scheduled operational review. The COTP, at his or her discretion, may observe the operational review.

(d) The VCS owner or operator must maintain, at the facility, the latest operational review letter issued under 33 CFR 154.2023.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection