33 CFR 159.111: Pressure and vacuum pulse test.
Where this section sits in the code
- Title 33—Navigation and Navigable Waters
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER O—POLLUTION
- PART 159—MARINE SANITATION DEVICES
- Subpart C—Design, Construction, and Testing
Liquid retention components of the device with manufacturer specified venting installed must be subjected to 50 fillings of water at a pressure head of 7 feet or the maximum pressure specified by the manufacturer for operation of the device, whichever is greater, and then emptied with a 45 gallon per minute or larger positive displacement pump that remains in operation 30 seconds after emptying the tank at the end of each cycle.
Collected 2026-08-27T02:25:35Z. Source file · JSON