GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 159.111: Pressure and vacuum pulse test.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER O—POLLUTION
  4. PART 159—MARINE SANITATION DEVICES
  5. Subpart C—Design, Construction, and Testing

Liquid retention components of the device with manufacturer specified venting installed must be subjected to 50 fillings of water at a pressure head of 7 feet or the maximum pressure specified by the manufacturer for operation of the device, whichever is greater, and then emptied with a 45 gallon per minute or larger positive displacement pump that remains in operation 30 seconds after emptying the tank at the end of each cycle.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection