GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

33 CFR 203.85: Rehabilitation of Federal flood control projects.

Read at publisher ↗
Where this section sits in the code
  1. Title 33—Navigation and Navigable Waters
  2. CHAPTER II—CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE
  3. PART 203—EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES
  4. Subpart G—Local Interests/Cooperation Agreements

Some sponsors of Federal flood control projects are not required to furnish written assurances of local cooperation, when such assurances already exist from the PCA of the original construction of the project. In lieu of a new PCA, the Corps will notify the sponsor, in writing, of the sponsor's standing requirements. These requirements include such items as LERRD's, costs attributable to deficient or deferred maintenance, removal of temporary works, cost-sharing requirements, and any other requirements contained in § 203.82. The project sponsor must acknowledge its responsibilities prior to the provision of Rehabilitation Assistance. If the existing PCA does not adequately address responsibilities, then a CA will be required.

Collected 2026-08-27T02:25:35Z. Source file · JSON

Browse this collection