GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

34 CFR 75.612: Avoidance of flood hazards.

Read at publisher ↗
Where this section sits in the code
  1. Title 34—Education
  2. Subtitle A—Office of the Secretary, Department of Education
  3. PART 75—DIRECT GRANT PROGRAMS
  4. Subpart E—What Conditions Must Be Met by a Grantee?

In planning the construction or real property project, a grantee must, consistent with Executive Order (E.O.) 11988 of May 24, 1977, E.O. 13690 of January 30, 2015, and E.O. 14030 of May 20, 2021—

(a) Evaluate flood hazards in connection with the construction;

(b) As far as practicable, avoid uneconomic, hazardous, or unnecessary use of flood plains in connection with the construction;

(c) Mitigate flood hazards through design such as elevating systems and first floor elevations above flood level plus freeboard; and

(d) Summarize remaining flood risks in a memorandum. CITA>[89 FR 70332, Aug. 29, 2024]

Collected 2026-08-27T02:25:40Z. Source file · JSON

Browse this collection