GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 1065.295: PM inertial balance for field-testing analysis.

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER U—AIR POLLUTION CONTROLS
  4. PART 1065—ENGINE-TESTING PROCEDURES
  5. Subpart C—Measurement Instruments

(a) Application. You may use an inertial balance to quantify net PM on a sample medium for field testing.

(b) Component requirements. We recommend that you use a balance that meets the specifications in Table 1 of § 1065.205. Note that your balance-based system must meet the linearity verification in § 1065.307. If the balance uses an internal calibration process for routine spanning and linearity verifications, the process must be NIST-traceable.

(c) Loss correction. You may use PM loss corrections to account for PM loss in the inertial balance, including the sample handling system.

(d) Deposition. You may use electrostatic deposition to collect PM as long as its collection efficiency is at least 95%.

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection