GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 1065.395: Inertial PM balance verifications.

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER U—AIR POLLUTION CONTROLS
  4. PART 1065—ENGINE-TESTING PROCEDURES
  5. Subpart D—Calibrations and Verifications

This section describes how to verify the performance of an inertial PM balance.

(a) Independent verification. Have the balance manufacturer (or a representative approved by the balance manufacturer) verify the inertial balance performance within 370 days before testing.

(b) Other verifications. Perform other verifications using good engineering judgment and instrument manufacturer recommendations.

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection