40 CFR 147.3007: Application for a permit.
Where this section sits in the code
- Title 40—Protection of Environment
- CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
- SUBCHAPTER D—WATER PROGRAMS
- PART 147—STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS
- Subpart HHH—Lands of the Navajo, Ute Mountain Ute, and All Other New Mexico Tribes
(a) Notwithstanding the requirements of § 144.31(c)(1) of this chapter, the owner or operator of an existing Class I or III well shall submit a complete permit application no later than 90 days after the effective date of the program.
(b) The topographic map (or other map if a topographic map is unavailable) required by § 144.31(e)(7) of this chapter, shall extend two miles from Class II wells, and 2 1/2 miles from Class I and III wells. These maps will show all the information listed in paragraph 144.31(e)(7) within 1/2 mile for Class II wells and 2 1/2 miles for Class I and III wells.