GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 192.03: Monitoring.

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER F—RADIATION PROTECTION PROGRAMS
  4. PART 192—HEALTH AND ENVIRONMENTAL PROTECTION STANDARDS FOR URANIUM AND THORIUM MILL TAILINGS
  5. Subpart A—Standards for the Control of Residual Radioactive Materials from Inactive Uranium Processing Sites

A groundwater monitoring plan shall be implemented, to be carried out over a period of time commencing upon completion of remedial actions taken to comply with the standards in § 192.02, and of a duration which is adequate to demonstrate that future performance of the system of disposal can reasonably be expected to be in accordance with the design requirements of § 192.02(c). This plan and the length of the monitoring period shall be modified to incorporate any corrective actions required under § 192.04 or § 192.12(c).

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection