GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 258.26: Run-on/run-off control systems.

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER I—SOLID WASTES
  4. PART 258—CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS
  5. Subpart C—Operating Criteria

(a) Owners or operators of all MSWLF units must design, construct, and maintain:

(1) A run-on control system to prevent flow onto the active portion of the landfill during the peak discharge from a 25-year storm;

(2) A run-off control system from the active portion of the landfill to collect and control at least the water volume resulting from a 24-hour, 25-year storm.

(b) Run-off from the active portion of the landfill unit must be handled in accordance with § 258.27(a) of this part.

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection