GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 440.142: Effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available (BPT).

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER N—EFFLUENT GUIDELINES AND STANDARDS
  4. PART 440—ORE MINING AND DRESSING POINT SOURCE CATEGORY
  5. Subpart M—Gold Placer Mine Subcategory

Except as provided in 40 CFR 125.30-125.32, any existing point source subject to this subpart must achieve the following effluent limitations representing the degree of effluent reduction attainable by the application of the best practicable control technology currently available (BPT):

(a) The concentration of pollutants discharged in process wastewater from an open-cut mine plant site shall not exceed:

Effluent limitations

Effluent characteristics Instantaneous maximum

Settleable solids 0.2 ml/l

(b) The concentration of pollutants discharged in process wastewater from a dredge plant site shall not exceed:

Effluent characteristics Effluent limitations—Instantaneous maximum

Settleable solids 0.2 ml/l

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection