GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 52.1870: Identification of plan.

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS
  5. Subpart KK—Ohio

(a) Purpose and scope. This section sets forth the applicable State Implementation Plan (SIP) for Ohio under Section 110 of the Clean Air Act, 42 U.S.C. 7401 et seq., and 40 CFR part 51 to meet National Ambient Air Quality Standards.

(b) Incorporation by reference. (1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to September 1, 2015, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval, and notice of any change in the material will be published in the Federal Register. Entries in paragraphs (c) and (d) of this section with an EPA approval date after September 1, 2015, will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 5 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the SIP as of September 1, 2015.

(3) Copies of the materials incorporated by reference may be inspected at the Environmental Protection Agency, Region 5, Air Programs Branch, 77 West Jackson Boulevard, Chicago, IL 60604 or the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call (202) 741-6030, or go to: http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c) EPA approved regulations.

EPA-Approved Ohio Regulations

Ohio citation Title/Subject Ohio effective date EPA Approval date Notes

Chapter 3745-14 Nitrogen Oxides—Reasonably Available Control Technology

3745-14-01 Definitions and General Provisions 8/15/2024 5/8/2025, 90 FR 19428

3745-14-03 Permit Requirements 1/29/2018 9/17/2019, 84 FR 48789

3745-14-04 Compliance Certification 8/22/2019 4/8/2020, 85 FR 19670

3745-14-08 Monitoring and Reporting 8/15/2024 5/8/2025, 90 FR 19428

3745-14-11 Portland Cement Kilns 7/18/2002 8/5/2003, 68 FR 46089

3745-14-12 Stationary Internal Combustion Engines 5/7/2005 2/4/2008, 73 FR 6427

Chapter 3745-15 General Provisions on Air Pollution Control

3745-15-01 Definitions 1/22/2009 5/10/2010, 75 FR 25770

3745-15-02 Purpose 1/25/1980 10/1/1982, 47 FR 43375

3745-15-03 Submission of Emission Information 6/30/2008 2/20/2013, 78 FR 11748 Only (A).

3745-15-04 Measurement of Emissions of Air Contaminants 1/25/1980 10/1/1982, 47 FR 43375

3745-15-05 De Minimis Air Contaminant Source Exemption 1/22/2009 5/10/2010, 75 FR 25770

3745-15-06 Malfunction of Equipment; Scheduled Maintenance; Reporting 1/25/1980 10/1/1982, 47 FR 43375

3745-15-07 Air Pollution Nuisances Prohibited 5/17/1982 8/13/1984, 49 FR 32182

3745-15-08 Circumvention 1/25/1980 10/1/1982, 47 FR 43375

3745-15-09 Severability 1/25/1980 10/1/1982, 47 FR 43375

Chapter 3745-16 Stack Height Requirements

3745-16-01 Definitions 3/5/1986 8/25/1988, 53 FR 32392

3745-16-02 Good Engineering Practice Stack Height Requirements 3/5/1986 8/25/1988, 53 FR 32392

Chapter 3745-17 Particulate Matter Standards

3745-17-01 Definitions and Referenced Materials 8/25/2023 7/18/2024, 89 FR 58293

3745-17-03 Measurement Methods and Procedures 8/25/2023 7/18/2024, 89 FR 58293 Except for paragraph (B)(1)(b) and the phrase in paragraph (B)(1)(a) reading “Except as provided in paragraph (B)(1)(b) of this rule”.

3745-17-04 Compliance Time Schedules 8/25/2023 7/18/2024, 89 FR 58293

3745-17-07 Control of Visible Particulate Emissions from Stationary Sources 8/25/2023 7/18/2024, 89 FR 58293

3745-17-08 Restriction of Emission of Fugitive Dust 8/25/2023 7/18/2024, 89 FR 58293

3745-17-09 Restrictions on Particulate Emissions and Odors from Incinerators 8/25/2023 7/18/2024, 89 FR 58293

3745-17-10 Restrictions on Particulate Emissions from Fuel Burning Equipment 8/25/2023 7/18/2024, 89 FR 58293

3745-17-11 Restrictions on Particulate Emissions from Industrial Processes 8/25/2023 7/18/2024, 89 FR 58293

3745-17-12 Additional Restrictions on Particulate Emissions from Specific Air Contaminant Sources in Cuyahoga County 8/25/2023 7/18/2024, 89 FR 58293

3745-17-13 Additional Restrictions on Particulate Emissions from Specific Air Contaminant Sources in Jefferson County 8/25/2023 7/18/2024, 89 FR 58293

3745-17-14 Contingency Plan Requirements for Cuyahoga and Jefferson Counties 8/25/2023 7/18/2024, 89 FR 58293

Chapter 3745-18 Sulfur Dioxide Regulations

3745-18-01 Definitions and incorporation by reference 2/3/2022 5/30/2023, 88 FR 34449

3745-18-02 General countywide emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-03 Compliance Time Schedules 2/3/2022 5/30/2023, 88 FR 34449

3745-18-04 Measurement Methods and Procedures 2/3/2022 5/30/2023, 88 FR 34449 Except (D)(2), (D)(3), (D)(5), (D)(6), (E)(2), (E)(3), and (E)(4).

3745-18-05 Ambient and Meteorological Monitoring Requirements 2/3/2022 5/30/2023, 88 FR 34449

3745-18-06 General Emission Limit Provisions 2/3/2022 5/30/2023, 88 FR 34449

3745-18-08 Allen county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-10 Ashtabula county emissions limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-11 Athens county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-15 Butler county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-23 Crawford county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-24 Cuyahoga county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-26 Defiance county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-28 Erie county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-31 Franklin county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-33 Gallia county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-35 Greene county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-37 Hamilton county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-47 Jefferson county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-49 Lake county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-53 Lorain county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-54 Lucas county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-56 Mahoning county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-61 Miami county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-63 Montgomery county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-66 Muskingum County Emission Limits 2/16/2017 10/11/2018, 83 FR 51361

3745-18-68 Ottawa county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-69 Paulding county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-77 Ross county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-78 Sandusky county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-80 Seneca county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-82 Stark County Emission Limits 4/16/2023 10/7/2024, 89 FR 81008

3745-18-83 Summit County Emission Limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-84 Trumbull County Emission Limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-85 Tuscarawas County Emission Limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-90 Washington County Emission Limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-91 Wayne county emission limits 2/3/2022 5/30/2023, 88 FR 34449

3745-18-92 Williams county emission limits 2/3/2022 5/30/2023, 88 FR 34449

Chapter 3745-19 Open Burning Standards

3745-19-01 Definitions 4/30/2018 6/24/2019, 84 FR 29378

3745-19-02 Relations to Other Prohibitions 7/7/2006 3/21/2008, 73 FR 15081

3745-19-03 Open burning in restricted areas 4/30/2018 6/24/2019, 84 FR 29378

3745-19-04 Open burning in unrestricted areas 4/30/2018 6/24/2019, 84 FR 29378

3745-19-05 Permission to individuals and notification to the Ohio EPA 4/30/2018 6/24/2019, 84 FR 29378

Chapter 3745-21 Carbon Monoxide, Ozone, Hydrocarbon Air Quality Standards, and Related Emission Requirements

3745-21-01 Definitions and incorporation by reference 3/27/2022 1/20/2026, 90 FR 2308

3745-21-02 Ambient air quality standards and guidelines 8/25/2008 7/28/2009, 74 FR 37171

3745-21-03 Methods of ambient air quality measurement 10/15/2015 9/8/2017, 82 FR 42451

3745-21-04 Compliance time schedules 3/27/2022 1/20/2026, 90 FR 2308

3745-21-06 Classification of regions 8/25/2008 7/28/2009, 74 FR 37171 3745-21-06.

3745-21-07 Control of emissions of organic materials from stationary sources (i.e., emissions that are not regulated by rule 3745-21-09, 3745-21-12 to 3745-21-16, or 3745-21-18 to 3745-21-29 of the Administrative Code) 3/27/2022 1/20/2026, 90 FR 2308 All except the entry for “TRC Buyer Co. dba “The Ruscoe Company” Plant II” in table (M)(1) Emissions Units under OAC 3745-21-07(M)(1).

3745-21-08 Control of carbon monoxide emissions from stationary sources 10/15/2015 9/8/2017, 82 FR 42451 3745-21-08.

3745-21-09 Control of emissions of volatile organic compounds from stationary sources and perchloroethylene from dry cleaning facilities 3/27/2022 6/26/26, 91 FR 28521 Except 3745-21-09(PP).

3745-21-10 Compliance test methods and procedures 3/27/2022 1/20/2026, 90 FR 2308

3745-21-11 Reasonably available control technology studies for non-CTG Sources in ozone nonattainment areas 3/27/2022 1/20/2026, 90 FR 2308

3745-21-12 Control of volatile organic compound emissions from commercial bakery oven facilities 10/15/2015 9/8/2017, 82 FR 42451

3745-21-13 Control of volatile organic compound emissions from reactors and distillation units employed in SOCMI chemical production 10/15/2015 9/8/2017, 82 FR 42451

3745-21-14 Control of volatile organic compound emissions from process vents in batch operations 10/15/2015 9/8/2017, 82 FR 42451

3745-21-15 Control of volatile organic compound emissions from wood furniture manufacturing operations 3/27/2022 1/20/2026, 90 FR 2308

3745-21-16 Control of volatile organic compound emissions from industrial wastewater 10/15/2015 9/8/2017, 82 FR 42451

3745-21-17 Portable fuel containers 10/15/2015 9/8/2017, 82 FR 42451

3745-21-18 Commercial motor vehicle and mobile equipment refinishing operations 3/27/2022 1/20/2026, 90 FR 2308

3745-21-19 Control of volatile organic compound emissions from aerospace manufacturing and rework facilities 3/27/2022 1/20/2026, 90 FR 2308

3745-21-20 Control of volatile organic emissions from shipbuilding and ship repair operations (marine coatings) 3/27/2022 1/20/2026, 90 FR 2308

3745-21-21 Storage of volatile organic liquids in fixed roof tanks and external floating roof tanks 3/27/2022 1/20/2026, 90 FR 2308

3745-21-22 Control of volatile organic compound emissions from offset lithographic printing and letterpress printing facilities 3/27/2022 1/20/2026, 90 FR 2308

3745-21-23 Control of volatile organic compound emissions from industrial solvent cleaning operations 3/27/2022 1/20/2026, 90 FR 2308

3745-21-24 Flat wood paneling coatings 3/27/2022 1/20/2026, 90 FR 2308

3745-21-25 Control of VOC emissions from reinforced plastic composites production operations 3/27/2022 1/20/2026, 90 FR 2308

3745-21-26 Surface coating of miscellaneous metal and plastic parts 3/27/2022 1/20/2026, 90 FR 2308

3745-21-27 Boat manufacturing 3/27/2022 1/20/2026, 90 FR 2308

3745-21-28 Miscellaneous industrial adhesives and sealants 3/27/2022 1/20/2026, 90 FR 2308

3745-21-29 Control of volatile organic compound emissions from automobile and light-duty truck assembly coating operations, heavier vehicle assembly coating operations, and cleaning operations associated with these coating operations 3/27/2022 1/20/2026, 90 FR 2308

Chapter 3745-23 Nitrogen Oxide Standards

3745-23-01 Definitions 8/15/2024 12/30/2024, 89 FR 106330

3745-23-02 Methods of Measurement 8/15/2024 12/30/2024, 89 FR 106330

Chapter 3745-24 Nitrogen Oxide Emission Statements

3745-24-01 Definitions 12/16/2005 9/27/2007, 72 FR 54844

3745-24-02 Applicability 12/16/2005 9/27/2007, 72 FR 54844

3745-24-03 Deadlines for the Submission of the Emission Statements 12/16/2005 9/27/2007, 72 FR 54844

3745-24-04 Emission Statement Requirements 4/1/1994 10/13/1994, 59 FR 51863

Chapter 3745-25 Emergency Episode Standards

3745-25-01 Definitions and Reference to Materials 12/19/2024 11/26/2025, 90 FR 52436

3745-25-02 Ambient Air Quality Standards 12/19/2024 11/26/2025, 90 FR 52436 Except (A)(4).

3745-25-03 Air Pollution Emergencies and Episode Criteria 12/19/2024 11/26/2025, 90 FR 52436

3745-25-04 Air Pollution Emergency Emission Control Action Programs 7/7/2025 11/26/2025, 90 FR 52436

3745-25-05 Air Pollution Emergency Orders 12/19/2024 11/26/2025, 90 FR 52436

Chapter 3745-26 I/M Program Rules and Regulations

3745-26-01 Definitions 8/15/1996 1/6/1997, 62 FR 646

3745-26-02 Obligations of the Motor Vehicle Owner in the Anti-tampering and Basic Automobile Inspection and Maintenance Programs 6/13/1994 4/4/1995, 60 FR 16989

3745-26-03 Inspection Station Licensing Procedure 5/15/1990 12/17/1993, 58 FR 65933

3745-26-04 Licensed Inspection Station Requirements and Obligations 5/15/1990 12/17/1993, 58 FR 65933

3745-26-05 Provisions for Qualification as a Class B Inspection Station 5/15/1990 12/17/1993, 58 FR 65933

3745-26-06 Requirements for Certified Inspectors 5/15/1990 12/17/1993, 58 FR 65933

3745-26-07 Suspension or Revocation of Inspection Station License or Inspector Certification 5/15/1990 12/17/1993, 58 FR 65933

3745-26-08 Procedure for Station Change of Ownership, Name, or Location, or Cessation of Inspection Operation 5/15/1990 12/17/1993, 58 FR 65933

3745-26-09 Fee System 5/15/1990 12/17/1993, 58 FR 65933

3745-26-10 Requirements for Contractors in the Basic Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program 6/13/1994 4/4/1995, 60 FR 16989

3745-26-11 Inspection Requirements 5/15/1990 12/17/1993, 58 FR 65933

3745-26-12 Requirements for Motor Vehicle Owners in the Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program 8/15/1996 1/6/1997, 62 FR 646

3745-26-13 Requirements for Certified Inspectors in the Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program 6/13/1994 4/4/1995, 60 FR 16989

3745-26-14 Enforcement of Program Rules and Regulations for the Enhanced or Opt-in Enhanced Automobile Inspection and Maintenance Program 6/13/1994 4/4/1995, 60 FR 16989

Chapter 3745-31 Permit-to-Install New Sources and Permit-to-Install and Operate Program

3745-31-01 Definitions 3/11/2023 4/2/2026, 91 FR 16550 Except for (A)(8), (E)(3)(b)(ii) and (iii), (M)(10)(a)(ii), (P)(12), (Q), and (S)(11).

3745-31-02 Applicability, requirements, and obligations 3/11/2023 4/2/2026, 91 FR 16550

3745-31-03 Exemptions 8/14/2025 4/2/2026, 91 FR 16550 Except for (B)(1)(p).

3745-31-04 Applications 5/29/2014 6/25/2015, 80 FR 36477

3745-31-05 Criteria for decision by the Director 3/11/2023 4/2/2026, 91 FR 16550 Except for (E).

3745-31-06 Completeness determinations, processing requirements, public participation, public notice, and issuance 3/11/2023 4/2/2026, 91 FR 16550

3745-31-07 Termination, revocation, expiration, renewal, revision and transfer 3/11/2023 4/2/2026, 91 FR 16550

3745-31-08 Registration status permit-to-operate 5/29/2014 6/25/2015, 80 FR 36477

3745-31-09 Variances on operation 3/11/2023 4/2/2026, 91 FR 16550

3745-31-10 NSR projects at existing emissions units at a major stationary source 3/11/2023 4/2/2026, 91 FR 16550

3745-31-11 Attainment provisions—ambient air increments, ceilings, and classifications 3/11/2023 4/2/2026, 91 FR 16550

3745-31-12 Attainment provisions—data submission requirements 3/11/2023 4/2/2026, 91 FR 16550

3745-31-13 Attainment provisions—review of major stationary sources and major modifications, stationary source applicability, and exemptions 3/11/2023 4/2/2026, 91 FR 16550 Except for (H)(1)(c).

3745-31-14 Attainment provisions—pre-application analysis 3/11/2023 4/2/2026, 91 FR 16550

3745-31-15 Attainment provisions—control technology review 3/11/2023 4/2/2026, 91 FR 16550

3745-31-16 Attainment provisions—major stationary source impact analysis 3/11/2023 4/2/2026, 91 FR 16550

3745-31-17 Attainment provisions—additional impact analysis 3/11/2023 4/2/2026, 91 FR 16550

3745-31-18 Attainment provisions—air quality models 3/11/2023 4/2/2026, 91 FR 16550

3745-31-19 Attainment provisions—notice to the United States environmental protection agency 3/11/2023 4/2/2026, 91 FR 16550

3745-31-20 Attainment provisions—innovative control technology 3/11/2023 4/2/2026, 91 FR 16550

3745-31-21 Nonattainment provisions—review of major stationary sources and major modifications—stationary source applicability and exemptions 3/11/2023 4/2/2026, 91 FR 16550

3745-31-22 Nonattainment provisions—conditions for approval 3/11/2023 4/2/2026, 91 FR 16550 Except for (A)(3)(b).

3745-31-23 Nonattainment provisions—stationary sources locating in designated clean or unclassifiable areas which would cause or contribute to a violation of a national ambient air quality standard 3/11/2023 4/2/2026, 91 FR 16550 Except for 1-hour NO2 SIL in (A).

3745-31-24 Nonattainment provisions—baseline for determining credit for emission and air quality offsets 3/11/2023 4/2/2026, 91 FR 16550 Except for (F).

3745-31-25 Nonattainment provisions—location of offsetting emissions 3/11/2023 4/2/2026, 91 FR 16550

3745-31-26 Nonattainment provisions—offset ratio requirements 3/11/2023 4/2/2026, 91 FR 16550 Except for (D).

3745-31-27 Nonattainment provisions—administrative procedures for emission offsets 3/11/2023 4/2/2026, 91 FR 16550 Except for (A)(1)(b).

3745-31-28 Review of major stationary sources of hazardous air pollutants requiring MACT determinations 3/11/2023 4/2/2026, 91 FR 16550

3745-31-29 General permit-to-install and general PTIO 3/11/2023 4/2/2026, 91 FR 16550

3745-31-30 Permits-by-rule 3/11/2023 4/2/2026, 91 FR 16550

3745-31-32 Plantwide applicability limit 3/11/2023 4/2/2026, 91 FR 16550

3745-31-34 Permits to install for major stationary sources and major modifications of sources emitting greenhouse gases 3/31/2011 2/14/2020, 85 FR 8406 Except for (B), (C), and (D).

Chapter 3745-49 Miscellaneous Rules

3745-49-01 Administrative Procedures—applicability and construction of rules 4/2/2012 4/23/2021, 86 FR 21648

3745-49-02 Administrative procedures—definitions 4/2/2012 4/23/2021, 86 FR 21648

3745-49-05 Draft actions and proposed actions 4/2/2012 4/23/2021, 86 FR 21648

3745-49-06 Issuance of final actions 4/2/2012 4/23/2021, 86 FR 21648

3745-49-07 Public notice 7/27/2019 4/23/2021, 86 FR 21648

3745-49-08 Contents of public notices 4/2/2012 4/23/2021, 86 FR 21648

Chapter 3745-101 Transportation Conformity

3745-101-02 Definitions 2/16/1999 5/30/2000, 65 FR 34395

3745-101-03 Applicability, Priority, and Frequency of Conformity Determinations 2/16/1999 5/30/2000, 65 FR 34395 Only (A), (B), (C), (D), (G), (H), (I), (J), (K), and (L).

3745-101-05 Content of Transportation Plans 2/16/1999 5/30/2000, 65 FR 34395

3745-101-06 Relationship with NEPA and Fiscal Constraints 2/16/1999 5/30/2000, 65 FR 34395

3745-101-07 Criteria and Procedures for Conformity Determination, Assumptions, Emissions Model, and Consultation 2/16/1999 5/30/2000, 65 FR 34395 Only (A), (B), and (C) Except (C)(1)(a) and (C)(2)(a).

3745-101-08 Criteria and Procedures for Implementation of TCMs, Current Conformity, and Projects from a Plan and TIP 2/16/1999 5/30/2000, 65 FR 34395

3745-101-09 Localized CO and PM10 Violations and Compliance with PM10 Control Measures 2/16/1999 5/30/2000, 65 FR 34395

3745-101-10 Motor Vehicle Emissions Budgets 2/16/1999 5/30/2000, 65 FR 34395

3745-101-11 Criteria and Procedures: Emission Reductions in Areas without Motor Vehicle Emissions Budgets 2/16/1999 5/30/2000, 65 FR 34395

3745-101-12 Consequences of Control Strategy Implementation Plan Failures 2/16/1999 5/30/2000, 65 FR 34395 Except for (A)(2).

3745-101-13 Requirements for Adoption or Approval of Projects by Other Recipients of Funds Designated Under Title 23 U.S.C. or the Federal Transit Laws 2/16/1999 5/30/2000, 65 FR 34395 Except for (A)(1).

3745-101-14 Procedures for Determining Regional Transportation-related Emissions 2/16/1999 5/30/2000, 65 FR 34395

3745-101-15 Procedures for Determining Localized CO and PM10 Concentrations (Hot-spot Analysis) 2/16/1999 5/30/2000, 65 FR 34395

3745-101-17 Enforceability of Design Concept and Scope and Project-level Mitigation and Control Measures 2/16/1999 5/30/2000, 65 FR 34395

3745-101-18 Exempt Projects 2/16/1999 5/30/2000, 65 FR 34395

3745-101-19 Traffic Signal Synchronization Projects 2/16/1999 5/30/2000, 65 FR 34395

Chapter 3745-102 General Federal Action Conformity

3745-102-01 Purpose 8/21/1995 3/11/1996, 61 FR 9644

3745-102-02 Definitions 8/21/1995 3/11/1996, 61 FR 9644

3745-102-03 Applicability 8/21/1995 3/11/1996, 61 FR 9644

3745-102-04 Analysis, Other Requirements 8/21/1995 3/11/1996, 61 FR 9644

3745-102-05 Conformity Determinations 8/21/1995 3/11/1996, 61 FR 9644

3745-102-06 Mitigation of Air Quality Impacts 8/21/1995 3/11/1996, 61 FR 9644

Chapter 3745-110—Nitrogen Oxides—Reasonably Available Control Technology

3745-110-01 Definitions 3/25/2022 1/20/2026, 90 FR 2308

3745-110-02 Applicability 3/25/2022 1/20/2026, 90 FR 2308

3745-110-03 RACT requirements and/or limitations for emissions of NOX from stationary sources 3/25/2022 1/20/2026, 90 FR 2308

3745-110-04 Compliance Deadlines 3/25/2022 1/20/2026, 90 FR 2308

3745-110-05 Compliance Methods 3/25/2022 1/20/2026, 90 FR 2308

Chapter 3745-112 Volatile Organic Compound Limits in Consumer Products

3745-112-01 Definitions 6/20/2022 7/10/2023, 88 FR 43440

3745-112-02 Applicability 6/20/2022 7/10/2023, 88 FR 43440

3745-112-03 Standards 6/20/2022 7/10/2023, 88 FR 43440

3745-112-04 Exemptions 6/20/2022 7/10/2023, 88 FR 43440

3745-112-05 Administrative Requirements 6/20/2022 7/10/2023, 88 FR 43440

3745-112-06 Reporting Requirements 6/20/2022 7/10/2023, 88 FR 43440

3745-112-07 Variances 6/20/2022 7/10/2023, 88 FR 43440

3745-112-08 Test Methods 6/20/2022 7/10/2023, 88 FR 43440

(d) EPA approved state source-specific requirements.

EPA-Approved Ohio Source-Specific Provisions

Name of source Number Ohio effective date EPA Approval date Comments

Accel Group, Inc P0120345 9/16/2019 10/30/2020, 85 FR 68758 Only paragraphs B.4, B.6, B.8, B.9.c), C.1.b)(1)d, C.1.b)(2)a, C.1.d)(2), C.1.d)(3), C.1.e)(3), C.1.f)(1)c, C.2.b)(1)d, C.2.b)(2)a, C.2.d)(2), C.2.d)(3), C.2.e)(3), and C.2.f)(1)e.

AK Steel Corporation Director's Final Findings and Orders (DFFO) 8/18/1995 4/25/1996, 61 FR 18255

Akron Paint and Varnish P0136483 12/11/2024 6/26/26, 91 FR 28521 Only sections B.8., C.3.b)(1)b., C.3.c)(1), C.3.d)(4), C.3.e)(4), C.3.f)(2), C.4.b)(1)c., C.4.c)(1), C.4.d)(1), C.4.e)(6), C.4.f)(2), C.5.b)(1)c., C.5.c)(1), C.5.d)(1), C.5.e)(6), and C.5.f)(2).

Cardinal Power Plant DFFO 7/26/2024 7/8/2025, 90 FR 29993 Regional haze emission limit.

Carmeuse Lime, Inc.-Grand River Operations P0137844 7/10/2025 6/26/26, 91 FR 28521 Only sections B.3.through B.7., C.1.b)(1)b., C.1.c)(1), C.1.d)(1), C.1.e)(1), C.1.f)(1)a., C.2.b)(1)b., C.2.c)(1), C.2.d)(1), C.2.e)(1), and C.2.f)(1)a.

Carmeuse Lime, Inc. Maple Grove DFFO 11/8/2024 12/11/2025, 90 FR 57374

Cleveland-Cliffs Cleveland Works P0138035 11/13/2025 6/26/2026, 91 FR 38517 Only sections C.1.b)(1)e., C.1.b)(2)a., C.1.d)(2), C.1.d)(3), C.1.d)(4), C.1.e)(2), C.1.e)(3), C.1.e)(5), C.1.f)(1)d., C.1.f)(1)f., and C.1.f)(2).

Cleveland-Cliffs Cleveland Works P0138036 11/13/2025 6/26/2026, 91 FR 38517 Only sections C.1.b)(1)i., C.1.b)(1) j., C.1.b)(1) k., C.1.b)(2)g., C.1.b)(2)h., C.1.d)(6)., C.1.d)(7)., C.1.e)(6), and C.1.f)(1)g.

Cleveland-Cliffs Cleveland Works P0138136 11/13/2025 6/26/2026, 91 FR 38517 Only sections B.11., C.1.b)(1)g., C.1.d)(7), C.1.e)(5), C.2.b)(1)g, C.2.d)(9), C.2.e)(6), C.3.b)(1)e., C.3.d)(4), C.3.e)(4), C.4.b)(1)f., C.4.d)(9), C.4.e)(6), C.5.b)(1)d., C.5.b)(1)e., C.5.b)(1)f., C.5.b)(2)d., C.5.d)(4), C.5.d)(5), C.5.e)(4), C.5.e)(5), C.5.e)(6), C.5.f)(1)e., C.6.b)(1)d., C.6.b)(1)e., C.6.b)(1)f., C.6.b)(2)d, C.6.d)(3), C.6.e)(4), C.6.f)(1)b, C.7.b)(1)h., C.7.b)(1)i., C.7.b)(1)j., C.7.b)(2)f., C.7.d)(5), C.7.d)(6), C.7.d)(7), C.7.e)(6), C.7.e)(7), C.7.f)(1)e., C.8.b)(1)e., C.8.b)(1)f., C.8.b)(1)g., C.8.b)(2)e., C.8.d)(2), C.8.d)(3), C.8.e)(4), C.8.e)(5), C.8.f)(1)d., C.9.b)(1)e., C.9.b)(1)f., C.9.b)(2)f., C.9.d)(3), C.9.e)(4), and C.9.f)(1)e.

Cleveland-Cliffs Cleveland Works P0138521 11/13/2025 6/26/2026, 91 FR 38517 Only sections C.1.b)(1)e., C.1.b)(1)f., C.1.b)(2)c., and C.1.f)(1).

Excello Specialty PTI 13-2396 12/11/1991 4/25/1996, 61 FR 18255

Ford-Cleveland Casting DFFO 7/10/1995 5/6/1996, 61 FR 20139

Ford-Engine Plant 1 DFFO 5/31/1996 2/25/1997, 62 FR 8383

Forest City Technologies, Plant 4 P0127984 6/23/2020 12/5/2023, 88 FR 84241 Only paragraphs C.1.b)(1)e., C.1.d)(3), C.1.e)(1)c., C.1.f)(1)d., C.2.b)(1)e., C.2.d)(4), C.2.e)(3)b., and C.2.f)(1)d.

General Electric Aviation, Evendale Plant P0136500 1/30/2025 6/26/26, 91 FR 28521 Only sections B.2., C.1.b)(1)c., C.1.b)(2)a., C.1.c)(1), C.1.d)(1), C.1.e)(2).

General Electric Aviation, Evendale Plant P0136501 1/30/2025 6/26/26, 91 FR 28521 Only sections B.2., C.1.b)(1)f., C.1.c)(2), C.1.d)(2), C.1.e)(3), C.2.b)(1)f., C.2.c)(2), C.2.d)(2), and C.2.e)(3).

General James M. Gavin Power Plant DFFO 7/26/2024 7/8/2025, 90 FR 29993 Regional haze emission limit. ROW> Globe Metallurgical Inc DFFOs 3/26/2025 4/2/2026, 91 FR 16558

Henkel P0138691 11/18/2025 6/26/2026, 91 FR 38517 Only sections B.4., C.1.b)(1).g., C.1.c)(2), C.1.d)(5), C.1.e)(7), C.1.f)(2), C.2.b)(1)f., C.2.c)(2), C.2.d)(6), C.2.e)(7), C.2.f)(2), C.3.b)(1)g., C.3.c)(2), C.3.d)(5), C.3.e)(7), C.3.f)(2), C.4.b)(1)g., C.4.c)(4), C.4.d)(5), C.4.e)(6), C.4.f)(2), C.5.b)(1)j., C.5.c)(3), C.5.d)(6), C.5.e)(9), C.5.f)(2), C.6.b)(1)d., C.6.c)(2), C.6.d)(2), C.6.e)(4), C.6.f)(3), C.7.b)(1)d., C.7.c)(2), C.7.d)(2), C.7.e)(4), and C.7.f)(3).

Hilton Davis PTI 14-2096 6/12/1991 4/25/1996, 61 FR 18255

International Mill Services DFFO 7/12/1995 5/6/1996, 61 FR 20139

International Paper Company DFFO 8/18/1995 4/25/1996, 61 FR 18255

Lubrizol P0138405 10/1/2025 6/26/2026, 91 FR 38517 Only sections B.2, B.3., B.4., B.5., C.1.b)(1)b., C.1.b)(2)a., C.1.d)(1), C.1.e)(1), and C.1.f)(2).

Luria Brothers DFFO 7/10/1995 5/6/1996, 61 FR 20139

Midwest Mica & Insulation Co DFFO 8/18/1995 4/25/1996, 61 FR 18255

Morgan Adhesives Co DFFO 7/5/2000 4/17/2001, 74 FR 19721

Ohio Valley Electric Corp.—Kyger Creek Station DFFO 7/26/2024 7/8/2025, 90 FR 29993 Regional haze emission limits.

Owens Corning P0137247 1/6/2025 6/26/26, 91 FR 28521 Only sections B.11., B.12., B.13., B.14., C.1.b)(1)b., C.1.c)(1), C.1.d)(1), C.1.e)(2), C.2.b)(1)b., C.2.c)(1), C.2.d)(1), C.2.e)(2), C.3.b)(1)b., C.3.c)(1), C.3.d)(1), C.3.e)(2), C.4.b)(1)b., C.4.c)(1), C.4.d)(1), C.4.e)(2), C.5.b)(1)b., C.5.c)(1), C.5.d)(3), C.5.e)(2), C.6.b)(1)c., C.6.d)(1), C.6.e)(2), C.6.f)(3), C.7.b)(1)b.), C.7.d)(1), C.7.e)(2), C.7.f)(2), C.8.b)(1)b., C.8.c)(1), C.8.d)(1), C.8.e)(2), C.9.b)(1)c., C.9.c)(1), C.9.d)(1), C.9.e)(2), C.10.b)(1)b., C.10.d)(1), C.10.e)(2), and C.10.f)(2).

P.H. Glatfelter Co.—Chillicothe P0118907 07/20/15 03/04/16, 81 FR 11447 Regional haze BART emissions limits.

RFD Beaufort, Inc P0127562 3/25/2025 3/23/2026, 91 FR 13773 Only paragraphs C.1.b)(1)c. and C.1.b)(2)c.

Reilly Industries, Inc DFFO 8/18/1995 4/25/1996, 61 FR 18255

Ross Incineration P0137637 7/31/2025 6/26/26, 91 FR 28521 Only sections C.1.b)(1)k., C.1.b)(1)l., C.1.b)(2)k., C.1.b)(2)l., C.1.c)(19), C.1.d)(54), C.1.e)(20), C.1.f)(1)f.

Smallwood P0130909 11/10/2021 1/20/2026, 90 FR 2308 Only sections C.1.b)(1)e., C.1.b)(2)b., C.1.c)(3), C.1.d)(7) and C.1.e)(5).

Sprayon Products, Inc DFFO 8/18/1995 4/25/1996, 61 FR 18255

T&B Foundry Company DFFO 7/10/1995 5/6/1996, 61 FR 20139

Tyson Foods P0137384 6/11/2025 6/26/26, 91 FR 28521 Only sections B.3., C.1.(b)(1)d., C.1.c)(3), C.1.d)(4), C.1.e)(3), C.1.f)(3), C.2.b)(1)d., C.2.c)(3), C.2.d)(4), C.2.e)(3), C.2.f)(3), C.3.b)(1)d., C.3.c)(2), C.3.d)(5), C.3.e)(3), C.3.f)(3), C.4.b)(1)d., C.4.c)(3), C.4.d)(5), C.4.e)(3), C.4.f)(3), C.5.b)(1)d., C.5.c)(3), C.5.d)(5), C.5.e)(3), C.5.f)(2)b. [that follows C.5.f)(2)h.] C.6.b)(1)d., C.6.c)(3), C.6.d)(4), C.6.e)(3), C.6.f)(3), C.7.b)(1)d., C.7.c)(3), C.7.d)(4), C.7.e)(3), and C.7.f)(3).

United Ready Mix DFFO 7/10/1995 5/6/1996, 61 FR 20139

Valgroup P0133504 7/18/2023 4/17/2025, 90 FR 16088 Only paragraphs C.2.b)(1), C.2.b)(1)d., C.2.b)(2), C.2.b)(2)d., C.2.d), C.2.d)(1), C.2.e), and C.2.e)(2).

Wheeling-Pittsburg Steel Corporation DFFO 10/31/1995 6/12/1996, 61 FR 29662

(e) EPA approved nonregulatory and quasi-regulatory provisions.

EPA-Approved Ohio Nonregulatory and Quasi-Regulatory Provisions

Title Applicable geographical or non-attainment area State date EPA approval Comments

Legislative Provisions

Authority to Require NSR Permits Statewide 1/25/1982 ORC 3704.03 (F).

Local Permits for Burning Construction Debris Statewide 7/15/1985 ORC 3704.11 (C).

Ohio EPA Authority Statewide 1/25/1982 ORC 3704 (summary).

Requirements for Board Members Statewide 1/25/1982 ORC 102 (summary).

Definition of Air Contaminant Statewide ORC 3704.01 (B); submitted 8/26/1982.

2015 Ozone Clean Data Determination Cleveland area (Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, Summit Counties) N/A 5/14/2026, 91 FR 27211 EPA's final determination suspends requirements for Ohio EPA to submit an attainment demonstration and other associated nonattainment planning requirements for the Cleveland area for as long as the area continues to attain the 2015 ozone NAAQS.

Summary of Criteria Pollutant Attainment Plans

Lead (2008) Canton (partial Stark County) 9/19/2024 7/16/2026, 91 FR 43557 Includes approval of the 2020 lead base year emissions inventory.

Ozone (8-Hour, 2015) Cincinnati 7/24/2020 3/3/2021, 86 FR 12270 EPA is approving only the 2014 base year emissions inventory and emissions statement elements.

Ozone (8-Hour, 2015) Cleveland 12/21/2022 7/7/2025, 90 FR 29742 EPA is approving only the 2017 base year emissions inventory, the reasonable further progress demonstration including associated 2023 motor vehicle emissions budgets, I/M, and nonattainment new source review.

PM2.5 (2012) Cleveland 10/14/2016 9/6/2018, 83 FR 45193 EPA is approving the following elements: the base year 2011 emissions inventory; the demonstration of attainment for 2021; current controls as meeting RACM requirements.

SO2 (2010) Lake County 2/16/2017 2/14/2019, 84 FR 3986 EPA is approving the following plan elements: The emission inventory; the demonstration of attainment; and revised emission limits as meeting RACM requirements.

SO2 (2010) Muskingum River 5/24/2023 9/8/2023, 88 FR 61969

SO2 (2010) Steubenville 6/25/2019 10/22/2019, 84 FR 56385

Summary of Criteria Pollutant Maintenance Plan

Ozone 1-Hour Cincinnati (Butler, Clermont, Hamilton, and Warren Counties) 6/28/1999 7/5/2000, 65 FR 37879

Ozone 1-Hour Columbiana County 3/25/1994 3/10/1995, 59 FR 48395

Ozone 1-Hour Columbus (Franklin, Delaware and Licking Counties) 1/1/1994 4/1/1996, 61 FR 3591

Ozone 1-Hour Dayton-Springfield (Miami, Montgomery, Clark, and Greene Counties) 11/8/1993 7/5/1995, 60 FR 22289

Ozone 1-Hour Jefferson County 3/25/1994 3/10/1995, 58 FR 66334

Ozone 1-Hour Youngstown (Mahoning and Trumbull Counties) and Canton (Stark County) 3/25/1994 4/1/1996, 61 FR 3319

Ozone (8-Hour, 1997) Canton (Stark County) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 1997) Cincinnati (Butler, Clermont, Clinton, Hamilton, and Warren Counties) 12/14/2009 5/11/2010, 75 FR 26118

Ozone (8-Hour, 1997) Cleveland (Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, and Summit Counties) 3/17/2009 9/15/2009, 74 FR 47414

Ozone (8-Hour, 1997) Columbus (Delaware, Fairfield, Franklin, Knox, Licking, and Madison Counties) 3/17/2009 9/15/2009, 74 FR 47404

Ozone (8-Hour, 1997) Dayton-Springfield (Miami, Montgomery, Clark, and Greene Counties) 4/12/2019 10/1/2019, 84 FR 52001

Ozone (8-Hour, 1997) Lima (Allen County) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 1997) Parkersburg-Marietta (Washington County) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 1997) Steubenville-Weirton (Jefferson County) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 1997) Toledo (Lucas and Wood Counties) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 1997) Wheeling (Belmont County) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 1997) Youngstown (Columbiana, Mahoning and Trumbull Counties) 4/12/2019 11/19/2019, 84 FR 63806

Ozone (8-Hour, 2008) Cincinnati (Butler, Clermont, Clinton, Hamilton, and Warren Counties) 11/6/2024 2/12/2026, 91 FR 6517 2nd maintenance plan. Conformity Budgets 2037 [tons/day] Ohio and Indiana: VOC 11.01; NOX 9.32

Ozone (8-Hour, 2008) Cleveland-Akron-Lorain (Ashtabula, Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, and Summit Counties) 11/6/2024 2/12/2026, 91 FR 6517 2nd maintenance plan. Conformity Budgets 2037 [tons/day] VOC 14.73; NOX 12.24

Ozone (8-Hour, 2008) Columbus (Delaware, Fairfield, Franklin, Knox, Licking, and Madison Counties) 11/6/2024 2/12/2026, 91 FR 6517 2nd maintenance plan. Conformity Budgets 2036 [tons/day] VOC 13.74; NOX 7.59

Ozone (8-Hour, 2015) Columbus (Delaware, Fairfield, Franklin, and Licking Counties 4/23/2019 8/21/2019, 84 FR 43508

Ozone (8-Hour, 2015) Cincinnati (Butler, Clermont, Hamilton, and Warren Counties) 12/21/2021 6/9/2022, 87 FR 35104 EPA is approving the following elements: a determination that the Cincinnati area has attained the 2015 8-Hour ozone standard, a maintenance plan for the 2015 a8-Hour ozone NAAQS, 2026 and 2035 VOC and NOX motor vehicle emission budgets for the Cincinnati area.

Ozone (8-hour, 2015) Cleveland (Cuyahoga, Geauga, Lake, Lorain, Medina, Portage, and Summit Counties) 12/8/2025 6/29/2026, 91 FR 39019

PM-10 Cuyahoga and Jefferson Counties 5/22/2000 1/10/2001, 65 FR 77308

PM2.5 (1997) Canton (Stark County) 6/26/2012 10/22/2013, 78 FR 62459

PM2.5 (1997) Cincinnati (Butler, Clermont, Hamilton, and Warren Counties) 1/25/2011 12/23/2011, 76 FR 80253

PM2.5 (1997) Cleveland (Ashtabula, Cuyahoga, Lake, Lorain, Medina, Portage, and Summit Counties) 10/5/2011 9/18/2013, 78 FR 57270

PM2.5 (1997) Columbus (Coshocton, Delaware, Fairfield, Franklin, and Licking Counties) 6/3/2011 11/7/2013, 78 FR 66845

PM2.5 (1997) Dayton-Springfield (Clark, Greene, and Montgomery Counties) 6/1/2011 9/26/2013, 78 FR 59258

PM2.5 (1997) Huntington-Ashland (Adams, Gallia, Lawrence, and Scioto Counties) 5/4/2011 12/31/2012, 77 FR 76883

PM2.5 (1997) Parkersburg-Marietta (Washington County) 2/29/2012 8/29/2013, 78 FR 53275

PM2.5 (1997) Steubenville-Weirton (Jefferson County) 4/16/2012 9/18/2013, 78 FR 57273

PM2.5 (1997) Wheeling (Belmont County) 4/16/2012 8/29/2013, 78 FR 53275

PM2.5 (2006) Canton (Stark County) 9/8/2021 1/22/2024, 89 FR 3889 2nd maintenance plan.

PM2.5 (2006) Cleveland (Cuyahoga, Lake, Lorain, Medina, Portage, and Summit Counties) 9/8/2021 1/22/2024, 89 FR 3889 2nd maintenance plan.

PM2.5 (2006) Steubenville-Weirton (Jefferson County) 9/8/2021 1/22/2024, 89 FR 3889 2nd maintenance plan.

PM2.5 (2012) Cleveland 7/24/2018 4/12/2019, 84 FR 14881 EPA is approving the following elements: a determination that the Cleveland area has attained the 2012 annual PM2.5 standard, a maintenance plan for the 2012 annual PM2.5 NAAQS, 2022 and 2030 primary PM2.5 and NOX MVEBs for the Cleveland area.

SO2 (1971) Center Township (Morgan County) and Waterford Township (Washington County) 6/25/1992 9/21/1994, 59 FR 48403

SO2 (1971) Lake County and Steubenville/Mingo Junction (Jefferson County) 10/26/1995 8/30/1999, 64 FR 47113

SO2 (1971) Franklin Township (Coshocton County), Addison Township (Gallia County), and Lorain County 3/20/2000 6/5/2000, 65 FR 35577

SO2 (1971) Cuyahoga and Lucas Counties 9/27/2003 7/8/2004, 69 FR 41342

SO2 (2010) Campbell-Clermont (Pierce Township in Clermont County) 11/07/2024 7/16/2025, 90 FR 31872 2nd Maintenance Plan.

SO2 (2010) Lake County 4/9/2018 5/14/2019, 84 FR 21253

SO2 (2010) Steubenville OH-WV (partial Jefferson County) 6/25/2019 11/29/2019, 84 FR 65683

SO2 (2010) Muskingum River 3/31/2025 4/2/2026, 91 FR 16558

CO (1979) Cleveland (Cuyahoga County) 10/20/2005 6/1/2006, 71 FR 31097

Lead (2008) Bellefontaine (Logan County) 10/29/2013 7/28/2014, 79 FR 43655 Includes approval of the 10/29/2013 emissions inventory.

Lead (2008) Canton (partial Stark County) 9/19/2024 7/16/2026, 91 FR 43557 Includes approval of the 2020 lead base year emissions inventory.

Lead (2008) Cleveland (partial Cuyahoga County) 6/29/2016 5/31/2017, 82 FR 24871 Includes approval of the 2013 lead base year emissions inventory and emission limits and PMP as RACM for the Ferro facility.

Lead (2008) Delta (partial Fulton County) 4/27/2017 3/13/2018, 83 FR 10796 Includes approval of the 2013 lead base year emissions inventory and Preventative Maintenance Plan as RACM/RACT for the Bunting Bearing LLC Delta facility.

Infrastructure Requirements

Section 110(a)(2) infrastructure requirements for the 1997 8-hour ozone NAAQS Statewide 12/5/2007 7/13/2011, 76 FR 41075 Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been remedied with a FIP.

Section 110(a)(2) infrastructure requirements for the 1997 PM2.5 NAAQS Statewide 12/5/2007 7/13/2011, 76 FR 41075 Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been remedied with a FIP.

Section 110(a)(2) infrastructure requirements for the 2006 PM2.5 NAAQS Statewide 9/4/2009 5/10/2018, 83 FR 21719 Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been disapproved and remedied with a FIP.

Section 110(a)(2) infrastructure requirements for the 2008 lead NAAQS Statewide 10/12/2011 10/6/2014, 79 FR 60075 Fully approved for all CAA elements.

Section 110(a)(2) infrastructure requirements for the 2008 ozone NAAQS Statewide 12/27/2012 5/10/2018, 83 FR 21719 Fully approved for all CAA elements except 110(a)(2)(D)(I), which has been disapproved and remedied with a FIP.

Section 110(a)(2) infrastructure requirements for the 2010 NO2 NAAQS Statewide 2/8/2013 5/10/2018, 83 FR 21719 Fully approved for all CAA elements.

Section 110(a)(2) infrastructure requirements for the 2010 SO2 NAAQS Statewide 6/7/2013 5/10/2018, 83 FR 21719 No action has been taken on 110(a)(2)(D)(I). All other CAA elements have been approved.

Section 110(a)(2)(D) infrastructure requirements for the 2012 PM2.5 NAAQS Statewide 12/4/2015 5/10/2018, 83 FR 21719 Fully approved for all CAA elements.

Section 110(a)(2) infrastructure requirements for the 2015 ozone NAAQS Statewide 9/28/2018 2/13/2023, 88 FR 9336 Approved CAA elements: 110(a)(2)(A), (B), (C), (D)(i)(II) prongs 3 and 4, (E), (F), (G), (H), (J), (K), (L), and (M). Elements (D)(i)(I) prongs 1 and 2 are disapproved.

Summary of Plan Element

Particulate Matter (PM-10) Plan Statewide 11/14/1991 6/27/1994, 59 FR 27464

Summary of the 15 Percent (%) Rate of Progress (ROP) Plan Control Measures for Volatile Organic Compounds (VOC) Emissions

Cincinnati 15% Plan Cincinnati (Butler, Clermont, Hamilton, and Warren Counties) 3/19/1994 3/30/1998, 63 FR 4188

Visibility Protection

Regional Haze Plan Statewide 11/30/2016 5/10/2018, 83 FR 21719 Full Approval.

Regional Haze Five-Year Progress Report Statewide 3/11/2016 12/21/2017, 82 FR 60543

Regional Haze Plan for the Second Implementation Period Statewide 7/30/2021, 8/6/2024, and 6/16/2025 7/8/2025, 90 FR 29993 Full Approval.

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection