GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 60.5110: How do I comply with the increment of progress for submittal of a control plan?

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES
  5. Subpart MMMM—Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units

For your control plan increment of progress, you must satisfy the two requirements specified in paragraphs (a) and (b) of this section.

(a) Submit the final control plan that includes the four items described in paragraphs (a)(1) through (a)(4) of this section.

(1) A description of the devices for air pollution control and process changes that you will use to comply with the emission limits and standards and other requirements of this subpart.

(2) The type(s) of waste to be burned, if waste other than sewage sludge is burned in the unit.

(3) The maximum design sewage sludge burning capacity.

(4) If applicable, the petition for site-specific operating limits under § 60.5175.

(b) Maintain an onsite copy of the final control plan.

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection