GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR 65.167: Other reports.

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 65—CONSOLIDATED FEDERAL AIR RULE
  5. Subpart G—Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process

(a) Replacing an existing control or recovery device. As specified in § 65.147(b)(2), § 65.148(b)(3), § 65.149(b)(3), § 65.150(b)(2), § 65.151(b)(2), § 65.152(b)(2), or § 65.153(b)(2), if an owner or operator at a facility not required to obtain a title V permit elects at a later date to use a different control or recovery device, then the Administrator shall be notified by the owner or operator before implementing the change. This notification may be included in the facility's periodic reporting and shall include a description of any changes made to the closed vent system.

(b) Startup, shutdown, and malfunction periodic reports. Startup, shutdown, and malfunction periodic reports shall be submitted as required in § 65.6(c).

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection