40 CFR Table 1 to Subpart GGG of Part 63: Table 1 to Subpart GGG of Part 63—General Provisions Applicability to Subpart GGG

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart GGG—National Emission Standards for Pharmaceuticals Production

General provisions reference Summary of requirements Applies to subpart GGG Comments

63.1(a)(1) General applicability of the General Provisions Yes Additional terms defined in § 63.1251; when overlap between subparts A and GGG of this part, subpart GGG takes precedence.

63.1(a)(2-7) Yes

63.1(a)(8) No Discusses state programs.

63.1(a)(9-14) Yes

63.1(b)(1) Initial applicability determination Yes Subpart GGG clarifies the applicability in § 63.1250.

63.1(b)(2) Title V operating permit—see part 70 Yes All major affected sources are required to obtain a title V permit.

63.1(b)(3) Record of the applicability determination Yes All affected sources are subject to subpart GGG according to the applicability definition of subpart GGG.

63.1(c)(1) Applicability after standards are set Yes Subpart GGG clarifies the applicability of each paragraph of subpart A to sources subject to subpart GGG.

63.1(c)(2) Title V permit requirement No All major affected sources are required to obtain a title V permit. Area sources are not subject to subpart GGG.

63.1(c)(3) Reserved

63.1(c)(4) Requirements for existing source that obtains an extension of compliance Yes

§ 63.1(c)(5) Notification requirements for an area source that increases HAP emissions to major source levels Yes

63.1(c)(6) Reclassification Yes

63.1(d) [Reserved] NA

63.1(e) Applicability of permit program before a relevant standard has been set Yes

63.2 Definitions Yes Additional terms defined in § 63.1251; when overlap between subparts A and GGG of this part occurs, subpart GGG takes precedence.

63.3 Units and abbreviations. Yes Other units used in subpart GGG are defined in that subpart.

63.4 Prohibited activities. Yes

63.5(a) Construction and reconstruction—applicability Yes Except replace the terms “source” and “stationary source” with “affected source”.

63.5(b)(1) Upon construction, relevant standards for new sources Yes

63.5(b)(2) [Reserved] NA

63.5(b)(3) New construction/reconstruction Yes Except for changes and additions authorized under § 52.2454 of this title. However, the requirement to submit the Precompliance report at least 90 days before the compliance date still applies.

63.5(b)(4) Construction/reconstruction notification Yes

63.5(b)(5) Construction/reconstruction compliance Yes

63.5(b)(6) Equipment addition or process change Yes

63.5(c) [Reserved] NA

63.5(d) Application for approval of construction/reconstruction Yes Except for certain provisions identified in 63.1259(a)(5).

§ 63.5(e) Construction/reconstruction approval Yes

63.5(f) Construction/reconstruction approval based on prior State review Yes Except replace “source” with “affected source”.

63.6(a)(1) Compliance with standards and maintenance requirements Yes

63.6(a)(2) Requirements for area source that increases emissions to become major Yes

63.6(b)(1-2) Compliance dates for new and reconstructed sources No Subpart GGG specifies compliance dates.

63.6(b)(3-6) Compliance dates for area sources that become major sources Yes

63.6 (b)(7) Compliance dates for new sources resulting from new unaffected area sources becoming subject to standards No Subpart GGG specifies NS applicability and compliance dates.

63.6(c) Compliance dates for existing sources Yes Except replace “source” with “affected source”. Subpart GGG specifies compliance dates.

§ 63.6(e)(1)(i) Requirements during periods of startup, shutdown, and malfunction No See 63.1250(g)(3) for general duty requirement. Any cross-reference to 63.6(e)(1)(i) in any other general provision incorporated by reference shall be treated as a cross-reference to 63.1250(g)(3).

§ 63.6(e)(1)(ii) Malfunction correction requirements No.

§ 63.6(e)(1)(iii) Enforceability of operation and maintenance requirements Yes.

§ 63.6(e)(2) Reserved No Section reserved.

§ 63.6(e)(3) Startup, shutdown, and malfunction plan requirements No.

63.6(f)(1) Applicability of nonopacity emission standards No.

63.6(f)(2)-(3) Methods of determining compliance and findings compliance Yes.

63.6(g) Use of an alternative nonopacity emission standard Yes.

63.6(h) Opacity and visible emission standards No Subpart GGG does not contain any opacity or visible emission standards.

§ 63.6(i)(1) through (7) Requests for compliance extensions No § 63.1250(f)(6) specifies provisions for compliance extensions.

§ 63.6(i)(8) through (14) Approval of compliance extensions Yes Except references to § 63.6(i)(4) through (6) mean § 63.1250(f)(6).

63.6(j) Exemption from compliance with emission standards Yes

63.7(a)(1) Performance testing requirements Yes Subpart GGG also specifies required testing and compliance procedures.

63.7(a)(2)(i)-(ix) Yes Except substitute “150 days” instead of “180 days.”

63.7(a)(3) Yes

63.7(b)(1) Notification of performance test Yes

63.7(b)(2) Notification of delay in conducting a scheduled performance test Yes

63.7(c) Quality assurance program Yes Except that the test plan must be submitted with the notification of the performance test.

63.7(d) Performance testing facilities Yes Except replace “source” with “affected source”.

63.7(e)(1) Conduct of performance tests No See 63.1257(a) text. Any cross-reference to 63.7(e)(1) in any other general provision incorporated by reference shall be treated as a cross-reference to 63.1257(a).

63.7(e)(2)-(4) Performance tests requirements Yes

63.7(f) Use of alternative test method Yes

63.7(g) Data analysis, recordkeeping, and reporting Yes

63.7(h) Waiver of performance tests Yes

63.8(a) Monitoring requirements Yes See § 63.1258.

63.8(b)(1) Conduct of monitoring Yes

63.8(b)(2) CMS and combined effluents No § 63.1258 of subpart GGG provides specific CMS requirements.

63.8(b)(3)-(c)(4) CMS requirements Yes § 63.1259 also specifies recordkeeping for CMS.

63.8(c)(5) COMS operation requirements No

63.8(c)(6)-(8) CMS calibration and malfunction provisions No Calibration procedures are provided in § 63.1258.

63.8(d)(1)-(2) CMS quality control program requirements Yes

63.8(d)(3) CMS quality control program recordkeeping requirements Yes, except for last sentence

63.8(e)(1) Performance evaluations of CMS Yes

63.8(e)(2) Notification of performance evaluation Yes

63.8(e)(3-4) CMS requirements/alternatives Yes

§ 63.8(e)(5)(i) Reporting performance evaluation results Yes See § 63.1260(a).

63.1260 (a).

63.8(e)(5)(ii) Results of COMS performance evaluation No Subpart GGG does not contain any opacity or visible emission standards.

63.8(f)-(g) Alternative monitoring method/reduction of monitoring data Yes

63.9(a)-(d) Notification requirements—Applicability and general information Yes § 63.1260 (b) also specifies initial notification requirement.

63.9(e) Notification of performance test Yes § 63.1260 (l) also specifies notification requirement for performance test.

63.9(f) Notification of opacity and visible emissions observations No Subpart GGG does not contain any opacity or visible emission standards.

63.9(g)(1) Additional notification requirements for sources with CMS Yes § 63.1260 (d) also specifies notification requirement for performance evaluation.

63.9(g)(2) Notification of compliance with opacity emission standard No Subpart GGG does not contain any opacity or visible emission standards.

63.9(g)(3) Notification that criterion to continue use of alternative to relative accuracy testing has been exceeded Yes § 63.1260 (d) also specifies notification requirement for performance evaluation.

63.9(h) Notification of compliance status Yes Specified in § 63.1260(f). Due 150 days after compliance date.

63.9(i) Adjustment to time periods or postmark deadlines for submittal and review of required communications Yes

63.9(j) Change in information provided Yes For change in major source status only.

63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).

63.10(a) Recordkeeping requirements Yes

63.1259.

63.10(b)(1) Records retention Yes Also stated in § 63.1259

63.10(b)(2) Information and documentation to support notifications No Subpart GGG specifies recordkeeping requirements.

63.10(b)(3) Records retention for sources not subject to relevant standard Yes Also stated in § 63.1259 (a)(2).

63.10(c)(1)-(9) Additional recordkeeping requirements for sources with continuous monitoring systems Yes

63.10(c)(10) Malfunction recordkeeping requirement No Subpart GGG specifies recordkeeping requirements.

63.10(c)(11) Malfunction corrective action recordkeeping requirement No Subpart GGG specifies recordkeeping requirements.

63.10(c)(12)-(14) Additional recordkeeping requirements for sources with continuous monitoring systems Yes

63.10(c)(15) Additional SSM recordkeeping requirements No

63.10(d)(1)-(2) General reporting requirements Yes

63.10(d)(3) Reporting results of opacity or visible emissions observations No Subpart GGG does not include any opacity or visible emission standards.

63.10(d)(4) Progress report requirements Yes

63.10(d)(5) Startup, shutdown, and malfunction report requirements No Subpart GGG specifies reporting requirements.

63.10(e) Additional CMS reporting requirements Yes

63.10(f) Waiver of recordkeeping or reporting requirements Yes

63.11 Control device and equipment leak work practice requirements Yes

63.13 Addresses of State air pollution control agencies Yes

63.14 Incorporations by reference Yes

63.15 Availability of information and confidentiality Yes