GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR Table 1 to Subpart LLLLLL of Part 63: Table 1 to Subpart LLLLLL of Part 63—Applicability of General Provisions to Subpart LLLLLL

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart LLLLLL—National Emission Standards for Hazardous Air Pollutants for Acrylic and Modacrylic Fibers Production Area Sources

Citation Subject Applies to subpart LLLLLL? Explanation

63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12) (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes

63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No

63.2 Definitions Yes

63.3 Units and Abbreviations Yes

63.4 Prohibited Activities and Circumvention Yes

63.5 Preconstruction Review and Notification Requirements No

63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f) (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes Subpart LLLLLL requires new and existing sources to comply with requirements for startups, shutdowns, and malfunctions in § 63.6(e)(3).

63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) Reserved No

63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) No Subpart LLLLLL does not include opacity or visible emissions standards or require a continuous opacity monitoring system.

63.7(a), (e), (f), (g), (h) Performance Testing Requirements Yes/No Subpart LLLLLL requires performance tests for new and existing sources; a test for an existing source is not required if a prior test meets the conditions in § 63.11395(h).

63.7(b), (c) Yes/No Requirements for notification of performance test and for quality assurance program apply to new sources but not existing sources.

63.8(a)(1), (a)(2), (b), (c)(1)-(c)(3), (f)(1)-(5) Monitoring Requirements Yes

63.8(a)(3) Reserved No

63.8(a)(4) Yes Requirements apply to new sources if flares are the selected control option.

63.8(c)(4)-(c)(8), (d), (e), (f)(6), (g) Yes Requirements apply to new sources but not to existing sources.

63.9(a), (b)(1), (b)(5), (c), (d), (i), (j) Notification Requirements Yes

63.9(e) Yes/No Notification of performance test is required for new area sources.

63.9(b)(2) Yes Initial notification of applicability is required for new and existing area sources.

63.9(b)(3), (h)(4) Reserved No

63.9(b)(4), (h)(5) No

63.9(f), (g) No Subpart LLLLLL does not require a continuous opacity monitoring system or continuous emissions monitoring system.

63.9(h)(1)-(h)(3), (h)(6) Yes Notification of compliance status is required for new and existing area sources.

63.10(a) Recordkeeping Requirements Yes

63.10(b)(1) Yes/No Record retention requirement applies to new area sources but not existing area sources. Subpart LLLLLL establishes 2-year retention period for existing area sources.

63.10(b)(2) Yes Recordkeeping requirements for startups, shutdowns, and malfunctions apply to new and existing area sources.

63.10(b)(3) Yes Recordkeeping requirements for applicability determinations apply to new area sources.

63.10(c)(1), (c)(5)-(c)(14) Yes/No Recordkeeping requirements for continuous parameter monitoring systems apply to new sources but not existing sources.

63.10(c)(2)-(c)(4), (c)(9) Reserved No

63.10(d)(1), (d)(4), (e)(1), (e)(2), (f) Reporting Requirements Yes

63.10(d)(2) Yes Report of performance test results applies to each area source required to conduct a performance test.

63.10(d)(3) No Subpart LLLLLL does not include opacity or visible emissions limits.

63.10(d)(5) Yes Requirements for startup, shutdown, and malfunction reports apply to new and existing area sources.

(e)(1)-(e)(2), (e)(4) No Subpart LLLLLL does not require a continuous emissions monitoring system or continuous opacity monitoring system.

63.10(e)(3) Yes/No Semiannual reporting requirements for excess emissions and parameter monitoring exceedances apply to new area sources but not existing area sources.

63.11 Control Device Requirements Yes Requirements apply to new sources if flares are the selected control option.

63.12 State Authorities and Delegations Yes

63.13 Addresses Yes

63.14 Incorporations by Reference Yes

63.15 Availability of Information and Confidentiality Yes

63.16 Performance Track Provisions. Yes

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection