GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR Table 1 to Subpart OOO of Part 63: Table 1 to Subpart OOO of Part 63—Applicability of General Provisions to Subpart OOO Affected Sources

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart OOO—National Emission Standards for Hazardous Air Pollutant Emissions: Manufacture of Amino/Phenolic Resins

Reference Applies to subpart OOO Explanation

63.1(a)(1) Yes § 63.1402 specifies definitions in addition to or that supersede definitions in § 63.2.

63.1(a)(2) Yes

63.1(a)(3) Yes § 63.1401(i) identifies those standards which overlap with the requirements of subpart OOO of this part and specify how compliance shall be achieved.

63.1(a)(4) Yes Subpart OOO (this table) specifies the applicability of each paragraph in subpart A of this part.

63.1(a)(5) No [Reserved].

63.1(a)(6) Yes

63.1(a)(7)-63.1(a)(9) No [Reserved].

63.1(a)(10) Yes

63.1(a)(11) Yes

63.1(a)(12)-63.1(a)(14) Yes

63.1(b)(1) No

63.1(b)(2) Yes

63.1(b)(3) No § 63.1400(e) provides documentation requirements for APPUs not considered affected sources.

63.1(c)(1) Yes Subpart OOO (this table) specifies the applicability of each paragraph in subpart A of this part.

63.1(c)(2) No Area sources are not subject to this subpart.

63.1(c)(3) No [Reserved].

63.1(c)(4) No [Reserved].

63.1(c)(5) Yes Except that affected sources are not required to submit notifications overridden by this table.

63.1(c)(6) Yes

63.1(d) No [Reserved].

63.1(e) Yes

63.2 Yes § 63.1402 specifies the definitions from subpart A of this part that apply to this subpart.

63.3 Yes

63.4(a)(1)-63.4(a)(3) Yes

63.4(a)(4) No [Reserved].

63.4(a)(5) Yes

63.4(b) Yes

63.4(c) Yes

63.5(a)(1) Yes Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.”

63.5(a)(2) Yes

63.5(b)(1) Yes Except § 63.1400(d) specifies when construction or reconstruction is subject to new source standards.

63.5(b)(2) No [Reserved].

63.5(b)(3) Yes

63.5(b)(4) Yes Except that the Initial Notification and § 63.9(b) requirements do not apply.

63.5(b)(5) Yes

63.5(b)(6) Yes Except that § 63.1400(d) specifies when construction or reconstruction is subject to new source standards.

63.5(c) No [Reserved].

63.5(d)(1)(i) Yes Except that the references to the Initial Notification and § 63.9(b)(5) do not apply.

63.5(d)(1)(ii) Yes Except that § 63.5(d)(1)(ii)(H) does not apply.

63.5(d)(1)(iii) No § 63.1417(e) specifies Notification of Compliance Status requirements.

63.5(d)(2) No

63.5(d)(3) Yes Except § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.1410 are exempt.

63.5(d)(4) Yes

63.5(e) Yes

63.5(f)(1) Yes

63.5(f)(2) Yes Except that where § 63.9(b)(2) is referred to, the owner or operator need not comply.

63.6(a) Yes

63.6(b)(1) Yes

63.6(b)(2) Yes

63.6(b)(3) Yes

63.6(b)(4) Yes

63.6(b)(5) Yes

63.6(b)(6) No [Reserved].

63.6(b)(7) No

63.6(c)(1) Yes Except that § 63.1401 specifies the compliance date.

63.6(c)(2) No

63.6(c)(3) No [Reserved].

63.6(c)(4) No [Reserved].

63.6(c)(5) Yes

63.6(d) No [Reserved].

63.6(e) Yes Except as otherwise specified in this table.

63.6(e)(1)(i) No See § 63.1400(k)(4) for general duty requirement.

63.6(e)(1)(ii) No

63.6(e)(1)(iii) Yes

63.6(e)(2) Yes

63.6(e)(3) No

63.6(f)(1) No

63.6(f)(2) Yes Except § 63.7(c), as referred to in § 63.6(f)(2)(iii)(D), does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.1410.

63.6(f)(3) Yes

63.6(g) Yes

63.6(h) No This subpart OOO does not require opacity and visible emission standards.

63.6(i)(1) Yes

63.6(i)(2) Yes

63.6(i)(3) Yes

63.6(i)(4)(i)(A) Yes

63.6(i)(4)(i)(B) No Dates are specified in §§ 63.1401(e) and 63.1417(d)(1).

63.6(i)(4)(ii) No

63.6(i)(5)-(14) Yes

63.6(i)(15) No [Reserved].

63.6(i)(16) Yes

63.6(j) Yes

63.7(a)(1) Yes

63.7(a)(2) No § 63.1417(e) specifies the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports.

63.7(a)(3) Yes

63.7(b) No § 63.1417 specifies notification requirements.

63.7(c) No

63.7(d) Yes

63.7(e)(1) No See § 63.1413(a)(2).

63.7(e)(2) Yes

63.7(e)(3) No Subpart OOO specifies requirements.

63.7(e)(4) Yes

63.7(f) Yes Except that if a site specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3), approval or disapproval of the alternative test method shall not be tied to the site specific test plan.

63.7(g) Yes Except that the requirements in § 63.1417(e) shall apply instead of the references to the Notification of Compliance Status report in § 63.9(h). In addition, equipment leaks subject to § 63.1410 are not required to conduct performance tests.

63.7(h) Yes Except § 63.7(h)(4)(ii) may not be applicable, if the site-specific test plan in § 63.7(c)(2) is not required.

63.8(a)(1) Yes

63.8(a)(2) No

63.8(a)(3) No [Reserved].

63.8(a)(4) Yes

63.8(b)(1) Yes

63.8(b)(2) No Subpart OOO specifies locations to conduct monitoring.

63.8(b)(3) Yes

63.8(c)(1) Yes

63.8(c)(1)(i) No

63.8(c)(1)(ii) No

63.8(c)(1)(iii) No

63.8(c)(2) Yes

63.8(c)(3) Yes

63.8(c)(4) No § 63.1415 specifies monitoring frequency; not applicable to equipment leaks because § 63.1410 does not require continuous monitoring systems.

63.8(c)(5)-63.8(c)(8) No

63.8(d) No

63.8(e) No

63.8(f)(1)-63.8(f)(3) Yes

63.8(f)(4)(i) No Timeframe for submitting request is specified in § 63.1417 (j) or (k); not applicable to equipment leaks because § 63.1410 (through reference to 40 CFR part 63, subpart UU) specifies acceptable alternative methods.

63.8(f)(4)(ii) No Contents of request are specified in § 63.1417(j) or (k).

63.8(f)(4)(iii) No

63.8(f)(5)(i) Yes

63.8(f)(5)(ii) No

63.8(f)(5)(iii) Yes

63.8(f)(6) No Subpart OOO does not require continuous emission monitors.

63.8(g) No Data reduction procedures specified in § 63.1416(a) and (h); not applicable to equipment leaks.

63.9(a) Yes

63.9(b) No Subpart OOO does not require an initial notification.

63.9(c) Yes

63.9(d) Yes

63.9(e) No § 63.1417 specifies notification deadlines.

63.9(f) No Subpart OOO does not require opacity and visible emission standards.

63.9(g) No

63.9(h) No § 63.1417(e) specifies Notification of Compliance Status requirements.

63.9(i) Yes

63.9(j) Yes For change in major source status only.

63.9(k) Yes Only as specified in § 63.9(j).

63.10(a) Yes

63.10(b)(1) No § 63.1416(a) specifies record retention requirements.

63.10(b)(2) No Subpart OOO specifies recordkeeping requirements.

63.10(b)(3) No § 63.1400(e) requires documentation of sources that are not affected sources.

63.10(c) No § 63.1416 specifies recordkeeping requirements.

63.10(d)(1) Yes

63.10(d)(2) No § 63.1417 specifies performance test reporting requirements; not applicable to equipment leaks.

63.10(d)(3) No Subpart OOO does not require opacity and visible emission standards.

63.10(d)(4) Yes

63.10(d)(5) No See § 63.1417(g) for malfunction reporting requirements.

63.10(e) No § 63.1417 specifies reporting requirements.

63.10(f) Yes

63.11 Yes Except that instead of § 63.11(b), § 63.1413(g) shall apply.

63.12 Yes

63.13-63.15 Yes

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection