GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR Table 1 to Subpart QQQQQQ of Part 63: Table 1 to Subpart QQQQQQ of Part 63—Applicability of General Provisions to Subpart QQQQQQ

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart QQQQQQ—National Emission Standards for Hazardous Air Pollutants for Wood Preserving Area Sources

As required in § 63.11432, you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.

Citation Subject Applies to subpart QQQQQQ? Explanation

63.1(a)(1)-(4) General applicability of the General Provisions Yes

63.1(a)(5) Reserved No

63.1(a)(6) General applicability of the General Provisions Yes

63.1(a)(7)-(9) Reserved No

63.1(a)(10)-(12) General applicability of the General Provisions Yes

63.1(b)(1) Initial applicability determination Yes

63.1(b)(2) Reserved No

63.1(b)(3) Record of applicability determination Yes

63.1(c)(1)-(2) Applicability of subpart A of this part after a relevant standard has been set Yes

63.1(c)(3)-(4) Reserved No

63.1(c)(5) Notification requirements for an area source that increases HAP emissions to major source levels Yes

63.1(c)(6) Reclassification Yes

63.1(d) Reserved No

63.1(e) Applicability of permit program before a relevant standard has been set Yes

63.2 Definitions Yes

63.3 Units and abbreviations Yes

63.4 Prohibited activities and circumvention Yes

63.5(a)(1) Applicability of preconstruction review requirements No

63.5(a)(2) Applicability of notification requirements Yes

63.5(b)(1) Requirements for newly constructed and reconstructed sources Yes

63.5(b)(2) Reserved No

63.5(b)(3) Required preconstruction approval required for major source construction and reconstruction No Subpart QQQQQQ does not regulate major sources.

63.5(b)(4) Notification requirements for construction or reconstruction of area sources Yes

63.5(b)(5) Reserved No

63.5(b)(6) Added equipment (or a process change) must be considered part of the affected source and subject to all provisions in the relevant standards Yes

63.5(c) Reserved No

63.5(d) Application for approval of construction or reconstruction No Subpart QQQQQQ does not require an application for construction or reconstruction.

63.5(e) Approval of construction or reconstruction No Subpart QQQQQQ does not require application approval before construction or reconstruction.

63.5(f) Approval of construction or reconstruction based on prior State preconstruction review No Subpart QQQQQQ does not require approval of construction or reconstruction based on prior State preconstruction review.

63.6(a) Compliance with standards and maintenance requirements Yes

63.6(b)(1)-(5) Compliance dates for new and reconstructed sources Yes

63(b)(6) Reserved No

63(b)(7) Compliance dates for new and reconstructed sources Yes

63.6(c)(1)-(2) Compliance dates for existing sources Yes

63.6(c)(3)-(4) Reserved No

63.6(c)(5) Compliance dates for existing sources Yes

63.6(d) Reserved No

63.6(e)(1) Operation and maintenance requirements Yes

63.6(e)(2) Reserved No

63.6(e)(3)(i) Startup, shutdown, and malfunction plan No Subpart QQQQQQ does not require a startup, shutdown, and malfunction plan.

63.6(e)(3)(ii) Reserved No

63.6(e)(3)(iii)-(ix) Startup, shutdown, and malfunction plan No Subpart QQQQQQ does not require a startup, shutdown, and malfunction plan.

63.6(f) Compliance with nonopacity emission standards No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(g) Use of an alternative nonopacity emission standard No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(h)(1) Compliance with opacity and visible emissions standards No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(h)(2)(i) Compliance with opacity and visible emissions standards No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(h)(2)(ii) Reserved No

63.6(h)(2)(iii) Compliance with opacity and visible emissions standards No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(h)(3) Reserved No

63.6(h)(4) Notification of opacity or visible emission observations No Subpart QQQQQQ does not contain emission or opacity limits.

63.6 (h)(5)(i)-(iii) Conduct of opacity or visible emission observations No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(h)(5)(iv) Reserved No

63.6(h)(5)(v) Conduct of opacity or visible emission observations No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(h)(6)-(9) Availability of records and use of continuous opacity monitoring system No Subpart QQQQQQ does not contain emission or opacity limits.

63.6(i) Extension of compliance with emissions standards Yes

63.6(j) Exemption from compliance with emissions standards Yes

63.7 Performance Testing Requirements No Subpart QQQQQQ does not require performance tests.

63.8(a)(1)-(2) Applicability of monitoring requirements No Subpart QQQQQQ does not require monitoring of emissions.

63.8(a)(3) Reserved No

63.8(a)(4) Applicability of monitoring requirements No Subpart QQQQQQ does not require monitoring of emissions.

63.8(b)-(g) Conduct of monitoring No Subpart QQQQQQ does not require monitoring of emissions.

63.9(a) Applicability and general information for notification requirements Yes

63.9(b)(1)-(2) Initial notifications Yes

63.9(b)(3) Reserved No

63.9(b)(4)-(5) Initial notifications Yes

63.9(c)-(d) Extension of compliance and special compliance requirements Yes

63.9(e), (f), (g) Notification of performance test, opacity and visible emission observation, and requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require monitoring of emissions.

63.9(h)(1)-(3) Notification of compliance status Yes

63.9(h)(4) Reserved No

63.9(h)(5)-(6) Notification of compliance status Yes

63.9(i)-(j) Adjustment to time periods or postmark deadlines for submittal and review of required communications, and change in information already provided Yes

63.9(k) Electronic submission of notifications and reports No Subpart QQQQQQ does not require electronic reporting.

63.10(a)-(b) Recordkeeping and reporting requirement applicability and general information No Subpart QQQQQQ establishes requirements for a report of deviations within 30 days.

63.10(c)(1) Additional recordkeeping requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require the use of continuous monitoring systems.

63.10(c)(2)-(4) Reserved No

63.10(c)(5)-(8) Additional recordkeeping requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require the use of continuous monitoring systems.

63.10(c)(9) Reserved No

63.10(c)(10)-(15) Additional recordkeeping requirements for sources with continuous monitoring systems No Subpart QQQQQQ does not require the use of continuous monitoring systems.

63.10(d)-(f) General reporting requirements, additional requirements for sources with continuous monitoring systems, and waiver of recordkeeping or reporting requirements No Subpart QQQQQQ establishes requirements for a report of deviations within 30 days.

63.11 Control device requirements for flares and work practice requirements for monitoring leaks No Subpart QQQQQQ does not require flares and does not require monitoring for leaks.

63.12 State authorities and delegations Yes

63.13 Addresses of state air pollution control agencies and EPA Regional Offices Yes

63.14 Incorporations by Reference Yes

63.15 Availability of information and confidentiality Yes

63.16 Requirements for Performance Track member facilities Yes

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection