GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

40 CFR Table 10 to Subpart IIIII of Part 63: Table 10 to Subpart IIIII of Part 63—Applicability of General Provisions to Subpart IIIII

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart IIIII—National Emission Standards for Hazardous Air Pollutants for Mercury Cell Chlor-Alkali Plants

As stated in § 63.8262, you must comply with the applicable General Provisions requirements according to the following table:

Citation Subject Applies to subpart IIIII Explanation

§ 63.1 Applicability Yes

§ 63.2 Definitions Yes

§ 63.3 Units and Abbreviations Yes

§ 63.4 Prohibited Activities Yes

§ 63.5 Construction/Reconstruction Yes

§ 63.6(a)-(g), (i), (j), except for (e)(1)(i) and (ii), (e)(3), and (f)(1) Compliance with Standards and Maintenance Requirements Yes

§ 63.6(e)(1)(i) and (ii), (e)(3), and (f)(1) SSM Requirements Yes Only applies until the date specified in § 63.8186(a)(3).

§ 63.6(h) Compliance with Opacity and Visible Emission Standards No Subpart IIIII does not have opacity and visible emission standards.

§ 63.7(a)-(h), except for (a)(2) and (e)(1) Performance Testing Requirements Yes Subpart IIIII specifies additional requirements related to site-specific test plans and the conduct of performance tests.

§ 63.7(a)(2) Applicability and Performance Test Dates No Subpart IIIII requires the performance test to be performed on the compliance date.

§ 63.7(e)(1) Performance Test Conditions No See § 63.8232(a).

§ 63.8(a)(1), (a)(3); (b); (c)(1)(ii), (2)-(4), (6)-(8); (d)(1)-(2); (e); and (f)(1)-(5) Monitoring Requirements Yes Only applies for CEMS, except Subpart IIIII specifies how and when the performance evaluation results are reported.

§ 63.8(a)(2) Continuous Monitoring System (CMS) Requirements No Subpart IIIII requires a site-specific monitoring plan in lieu of a promulgated performance specification for a mercury concentration CMS.

§ 63.8(a)(4) Additional Monitoring Requirements for Control Devices in § 63.11 No Subpart IIIII does not require flares.

§ 63.8(c)(1)(i) and (iii) CMS Operation and SSM Plan Yes Only applies until the date specified in § 63.8186(a)(3).

§ 63.8(c)(5) COMS Minimum Procedures No Subpart IIIII does not have opacity and visible emission standards.

§ 63.8(d)(3) Written Procedures for CMS No See § 63.8242(a)(3)(v).

§ 63.8(f)(6) Alternative to Relative Accuracy Test No Subpart IIIII does not require CEMS.

§ 63.8(g) Data Reduction No Subpart IIIII specifies mercury concentration CMS data reduction requirements.

§ 63.9(a)-(e), (g)-(j) Notification Requirements Yes

§ 63.9(f) Notification of VE/Opacity Test No Subpart IIIII does not have opacity and visible emission standards.

§ 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).

§ 63.10(a); (b)(1); (b)(2)(vi)-(xii), (xiv); (b)(3); (c)(1)-(14); (d)(1), (4); (e); (f) Recordkeeping/Reporting Yes

§ 63.10(b)(2)(i)-(v) Recordkeeping/Reporting Associated with Startup, Shutdown, and Malfunctions Yes Only applies until the date specified in § 63.8186(a)(3).

§ 63.10(b)(2)(xiii) CMS Records for RATA Alternative No Subpart IIIII does not require CEMS.

§ 63.10(c)(15) Use of SSM Plan Yes Only applies until the date specified in § 63.8186(a)(3).

§ 63.10(d)(2) Performance Test Results No This subpart at 63.8232(g) specifies how and when the performance test results are reported electronically.

§ 63.10(d)(3) Reporting Opacity or VE Observations No Subpart IIIII does not have opacity and visible emission standards.

§ 63.10(d)(5) Startup, Shutdown, and Malfunction Reports No

§ 63.10(e)(2)(i) CEM Reporting Yes Except this subpart specifies how and when the performance evaluation results are reported.

§ 63.11 Flares No Subpart IIIII does not require flares.

§ 63.12 Delegation Yes

§ 63.13 Addresses Yes

§ 63.14 Incorporation by Reference Yes

§ 63.15 Availability of Information Yes

Collected 2026-08-27T02:26:04Z. Source file · JSON

Browse this collection