40 CFR Table 6 to Subpart O of Part 63: Table 6 to Subpart O of Part 63—Applicability of General Provisions to This Subpart

Read at publisher ↗
Where this section sits in the code
  1. Title 40—Protection of Environment
  2. CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
  3. SUBCHAPTER C—AIR PROGRAMS
  4. PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
  5. Subpart O—Ethylene Oxide Emissions Standards for Sterilization Facilities

As specified in § 63.360, the parts of the General Provisions that apply to you are shown in the following table:

Citation Subject Applies to subpart O

§ 63.1(a)(1) Applicability Yes, additional terms defined in § 63.361; when overlap between subparts A and O occurs, subpart O takes precedence.

§ 63.1(a)(2)-(3) Yes.

§ 63.1(a)(4) Yes. Subpart O clarifies the applicability of each paragraph in subpart A to facilities subject to subpart O.

§ 63.1(a)(5) [Reserved] No.

§ 63.1(a)(6)-(8) Yes.

§ 63.1(a)(9) [Reserved]

§ 63.1(a)(10)-(14) Yes.

§ 63.1(b)(1)-(2) Yes.

§ 63.1(b)(3) No.

§ 63.1(c)(1) No. Subpart O clarifies the applicability of each paragraph in subpart A to facilities subject to subpart O in this table.

§ 63.1(c)(2) Yes.

§ 63.1(c)(3) [Reserved] No.

§ 63.1(c)(4) Yes.

§ 63.1(c)(5) No. § 63.360 specifies applicability.

§ 63.1(c)(6) Yes.

§ 63.1(d) [Reserved] No.

§ 63.1(e) Yes.

§ 63.2 Definitions Yes, additional terms defined in § 63.361; when overlap between subparts A and O occurs, subpart O takes precedence.

§ 63.3 Units and abbreviations Yes, other units used in subpart O are defined in the text of subpart O.

§ 63.4(a)(1)-(3) Prohibited activities Yes.

§ 63.5(a) Construction/Reconstruction No. § 63.366(b)(1) contains applicability requirements for constructed or reconstructed facilities.

§ 63.5(b)(1) Yes.

§ 63.5(b)(2) [Reserved]

§ 63.5(b)(3) No. See § 63.366(b)(2).

§ 63.5(b)(4)-(6) Yes.

§ 63.5(c) [Reserved]

§ 63.5(d)(1)-(2) No. See § 63.366(b)(3).

§ 63.5(d)(3)-(4) Yes.

§ 63.5(e) Yes.

§ 63.5(f)(1)-(2) No. See § 63.366(b)(4).

§ 63.6(a) Applicability Yes.

§ 63.6(b)-(c) No. § 63.360(j) specifies compliance dates for facilities.

§ 63.6(d) [Reserved]

§ 63.6(e)(1)(i) No.

§ 63.6(e)(1)(ii) Requirement to correct malfunctions ASAP No.

§ 63.6(e)(1)(iii) Yes.

§ 63.6(e)(2) [Reserved] No.

§ 63.6(e)(3) SSM Plan Requirements No.

§ 63.6(f)(1) SSM exemption No.

§ 63.6(f)(2)(i) Methods for Determining Compliance Yes.

§ 63.6(f)(2)(ii) No. § 63.363 specifies parameters for determining compliance.

§ 63.6(f)(2)(iii)-(iv) Yes.

§ 63.6(f)(2)(v) No.

§ 63.6(f)(3) Yes.

§ 63.6(g) Alternative Standard Yes.

§ 63.6(h) Compliance with opacity and visible emission standards No. Subpart O does not contain any opacity or visible emission standards.

§ 63.6(i)(1)-(14), and (16) Compliance Extension Yes.

§ 63.6(j) Presidential Compliance Exemption Yes.

§ 63.7(a) Applicability and Performance Test Dates Yes.

§ 63.7(b) Notification of Performance Test Yes.

§ 63.7(c) Quality Assurance/Test Plan Yes.

§ 63.7(d) Testing Facilities Yes.

§ 63.7(e)(1) SSM exemption No.

§ 63.7(e)(2)-(4) Conduct of Performance Tests Yes. § 63.365 also contains test methods specific to facilities subject to the emissions standards.

§ 63.7(f) Alternative Test Method Yes.

§ 63.7(g) Performance Test Data Analysis Yes, except this subpart specifies how and when the performance test and performance evaluation results are reported.

§ 63.7(h) Waiver of Tests Yes.

§ 63.8(a)(1) Applicability of Monitoring Requirements Yes.

§ 63.8(a)(2) Performance Specifications Yes.

§ 63.8(a)(3) [Reserved] No.

§ 63.8(a)(4) Monitoring with Flares Yes.

§ 63.8(b)(1) Monitoring Yes.

§ 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring Systems Yes.

§ 63.8(c)(1)(i) General duty to minimize emissions and CMS operation No.

§ 63.8(c)(1)(ii) No. A startup, shutdown, and malfunction plan is not required for these standards.

§ 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No.

§ 63.8(c)(2)-(3) Yes.

§ 63.8(c)(4)-(5) No. Frequency of monitoring measurements is provided in § 63.364; opacity monitors are not required for these standards.

§ 63.8(c)(6) No. Performance specifications are contained in § 63.365.

§ 63.8(c)(7)(i)(A)-(B) No. Performance specifications are contained in § 63.365.

§ 63.8(c)(7)(i)(C) No. Opacity monitors are not required for these standards.

§ 63.8(c)(7)(ii) No. Performance specifications are contained in § 63.365.

§ 63.8(c)(8) No.

§ 63.8(d)(1)-(2) Yes.

§ 63.8(d)(3) Written procedures for CMS No.

§ 63.8(e)(1) CMS Performance Evaluation Yes, but only applies for CEMS, except this subpart specifies how and when the performance evaluation results are reported.

§ 63.8(e)(2) Yes.

§ 63.8(e)(3) Yes.

§ 63.8(e)(4) Yes.

§ 63.8(e)(5)(i) Yes.

§ 63.8(e)(5)(ii) No. Opacity monitors are not required for these standards.

§ 63.8(f)(1)-(5) Yes.

§ 63.8(f)(6) No.

§ 63.8(g)(1) Yes.

§ 63.8(g)(2) No.

§ 63.8(g)(3)-(5) Yes.

§ 63.9(a) Notification requirements Yes.

§ 63.9(b)(1)-(i) Yes.

§ 63.9(b)(1)(ii)-(iii) Initial Notifications No. § 63.366(c)(1)(i) contains language for facilities that increase usage such that the source becomes subject to the emissions standards.

§ 63.9(b)(2)-(3) Initial Notifications Yes. § 63.366(c)(3) contains additional information to be included in the initial report for existing and new facilities.

§ 63.9(b)(4)-(5) Initial Notifications No. § 63.366(c)(1)(ii) and (iii) contains requirements for new or reconstructed facilities subject to the emissions standards.

§ 63.9(c) Request for Compliance Extension Yes.

§ 63.9(d) Notification of Special Compliance Requirements for New Sources No.

§ 63.9(e) Notification of Performance Test Yes.

§ 63.9(f) Notification of VE/Opacity Test No. Opacity monitors are not required for these standards.

§ 63.9(g)(1) Additional Notifications When Using CMS Yes.

§ 63.9(g)(2)-(3) Additional Notifications When Using CMS No. Opacity monitors and relative accuracy testing are not required for these standards.

§ 63.9(h)(1)-(3) Notification of Compliance Status Yes, except § 63.9(h)(5) does not apply because § 63.366(c)(2) instructs facilities to submit actual data.

§ 63.9(i) Adjustment of Submittal Deadlines Yes.

§ 63.9(j) Change in previous information Yes.

§ 63.9(k) Electronic reporting procedures Yes, as specified in § 63.9(j).

§ 63.10(a) Recordkeeping/Reporting Yes.

§ 63.10(b)(1) Recordkeeping/Reporting Yes.

§ 63.10(b)(2)(i) Recordkeeping for startup and shutdown No. See 63.367(f) for recordkeeping requirements.

§ 63.10(b)(2)(ii) Recordkeeping for SSM and failures to meet standards No. See 63.367(f) for recordkeeping requirements.

§ 63.10(b)(2)(iii) Records related to maintenance of air pollution control equipment Yes.

§ 63.10(b)(2)(iv)-(v) Actions taken to minimize emissions during SSM No.

§ 63.10(b)(2)(vi) CMS Records Yes.

§ 63.10(b)(2)(vii)-(ix) Records Yes.

§ 63.10(b)(2)(x)-(xi) CMS Records Yes.

§ 63.10(b)(2)(xii) Records Yes.

§ 63.10(b)(2)(xiii) Records Yes.

§ 63.10(b)(2)(xiv) Records Yes.

§ 63.10(b)(3) Records Yes.

§ 63.10(c)(1)-(14) Records Yes.

§ 63.10(c)(15) Use of SSM Plan No.

§ 63.10(d)(1) General Reporting Requirements Yes.

§ 63.10(d)(2) Report of Performance Test Results No. This subpart specifies how and when the performance test results are reported.

§ 63.10(d)(3) Reporting Opacity or VE Observations No. Subpart O does not contain opacity or visible emissions standards.

§ 63.10(d)(4) Progress Reports Yes.

§ 63.10(d)(5) SSM Reports No. See § 63.366 for malfunction reporting requirements.

§ 63.10(e)(1) Additional CEMS Reports Yes.

§ 63.10(e)(2)(i) Additional CMS Reports Yes, except this subpart specifies how and when the performance evaluation results are reported.

§ 63.10(e)(2)(ii) Additional COMS Reports No. Opacity monitors are not required for these standards.

§ 63.10(e)(3)(i)-(iv) Reports Yes.

§ 63.10(e)(3)(v) Excess Emissions Reports No. § 63.366(b) and (c) specify contents and submittal dates for excess emissions and monitoring system performance reports.

§ 63.10(e)(3)(vi)-(viii) Excess Emissions Report and Summary Report Yes.

§ 63.10(e)(4) Reporting COMS data No. Opacity monitors are not required for these standards.

§ 63.10(f) Waiver for Recordkeeping/Reporting Yes.

§ 63.11 Control device requirements for flares and work practice requirements for equipment leaks Yes.

§ 63.12 Delegation Yes.

§ 63.13 Addresses Yes.

§ 63.14 Incorporation by Reference Yes.

§ 63.15 Availability of Information Yes.