40 CFR Table 7 to Subpart PPPPP of Part 63: Table 7 to Subpart PPPPP of Part 63—Applicability of General Provisions to Subpart PPPPP
Where this section sits in the code
- Title 40—Protection of Environment
- CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
- SUBCHAPTER C—AIR PROGRAMS
- PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES
- Subpart PPPPP—National Emission Standards for Hazardous Air Pollutants for Engine Test Cells/Stands
As stated in 63.9365, you must comply with the General Provisions in §§ 63.1 through 63.15 that apply to you according to the following table:
Citation Subject Applicable to subpart PPPPP Explanation
§ 63.1(a)(1)-(12) General Applicability Yes
§ 63.1(b)(1)-(3) Initial Applicability Determination Yes Applicability to subpart PPPPP is also specified in § 63.9285.
§ 63.1(c)(1) Applicability After Standard Established Yes
§ 63.1(c)(2) Applicability of Permit Program for Area Sources No Area sources are not subject to subpart PPPPP.
§ 63.1(c)(5) Notifications Yes
§ 63.1(c)(6) Applicability Reclassification Yes.
§ 63.1(d) [Reserved]
§ 63.1(e) Applicability of Permit Program Before Relevant Standard is Set Yes
§ 63.2 Definitions Yes Additional definitions are specified in § 63.9375.
§ 63.3 Units and Abbreviations Yes
§ 63.4 Prohibited Activities and Circumvention Yes
§ 63.5(a) Construction/Reconstruction Yes
§ 63.5(b) Requirements for Existing, Newly Constructed, and Reconstructed Sources Yes
§ 63.5(d) Application for Approval of Construction/Reconstruction Yes
§ 63.5(e) Approval of Construction/Reconstruction Yes
§ 63.5(f) Approval of Construction/Reconstruction based on Prior State Review Yes
§ 63.6(a) Compliance With Standards and Maintenance Requirements-Applicability Yes
§ 63.6(b)(1)-(7) Compliance Dates for New and Reconstructed Sources Yes § 63.9295 specifies the compliance dates.
§ 63.6(c)(1)-(2) Compliance Dates for Existing Sources No Subpart PPPPP does not establish standards for existing sources.
§ 63.6(c)(5) Compliance Dates for Existing Sources Yes § 63.9295(b) specifies the compliance date if a new or reconstructed area source becomes a major source.
§ 63.6(e)(1)(i) Operation and Maintenance Yes before December 1, 2020. No on and after December 1, 2020 See § 63.9305 for general duty requirement.
§ 63.6(e)(1)(ii) Operation and Maintenance Yes before December 1, 2020. No on and after December 1, 2020
§ 63.6(e)(1)(iii) Operation and Maintenance Yes
§ 63.6(e)(3) SSM Plan Yes before December 1, 2020. No on and after December 1, 2020
§ 63.6(f)(1) Compliance Except During SSM Yes before December 1, 2020. No on and after December 1, 2020
§ 63.6(f)(2)-(3) Methods for Determining Compliance Yes
§ 63.6(g)(1)-(3) Use of Alternative Standards Yes
§ 63.6(h) Compliance With Opacity/Visible Emission Standards No Subpart PPPPP does not establish opacity standards and does require continuous opacity monitoring systems (COMS).
§ 63.6(i)(1)-(16) Extension of Compliance No Compliance extension provisions apply to existing sources which do not have emission limitations in subpart PPPPP.
§ 63.6(j) Presidential Compliance Exemption Yes
§ 63.7(a)(1)-(2) Performance Test Dates Yes
§ 63.7(a)(3) Performance Test Required By the Administrator Yes
§ 63.7(b)-(d) Performance Test Requirements-Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During Testing Yes
§ 63.7(e)(1) Conditions for Conducting Performance Tests Yes before December 1, 2020. No, see § 63.9321, on and after December 1, 2020
§ 63.7(e)(2)-(4) Conduct of Performance Tests Yes
§ 63.7(f) Alternative Test Methods Yes
§ 63.7(g)-(h) Performance Testing Requirements-Data Analysis, Recordkeeping, Reporting, Waiver of Test Yes
§ 63.8(a)(1)-(2) Monitoring Requirements—Applicability Yes Subpart PPPPP contains specific requirement for monitoring at § 63.9325.
§ 63.8(a)(4) Additional Monitoring Requirements No Subpart PPPPP does not have monitoring requirement for flares.
§ 63.8(b) Conduct of Monitoring Yes
§ 63.8(c)(1) Continuous Monitoring System (CMS) Operation and Maintenance Yes
§ 63.8(c)(1)(i) General Duty to Minimize Emissions and CMS Operation Yes before December 1, 2020. No on and after December 1, 2020
§ 63.8(c)(1)(ii) Operation and Maintenance of CMS Yes
§ 63.8(c)(1)(iii) Requirement to Develop SSM Plan for CMS Yes before December 1, 2020. No on and after December 1, 2020
§ 63.8(c)(2)-(3) Monitoring System Installation Yes
§ 63.8(c)(4) CMS No § 63.9335(a) and (b) specifies the requirements.
§ 63.8(c)(5) COMS No Subpart PPPPP does not have opacity or VE standards.
§ 63.8(c)(6)-(8) CMS Requirements Yes Except that subpart PPPPP does not require COMS.
§ 63.8(d)(1)-(2) CMS Quality Control Yes
§ 63.8(d)(3) CMS Quality Control Yes before December 1, 2020. No on and after December 1, 2020
§ 63.8(e) CMS Performance Yes Except for § 63.8(e)(5)(ii) which applies to COMS.
§ 63.8(f)(1)-(5) Alternative Monitoring Method Yes
§ 63.8(f)(6) Alternative to Relative Accuracy Test Yes
§ 63.8(g) Data Reduction Yes before December 1, 2020. No on and after December 1, 2020 §§ 63.9335 and 63.9340 specify monitoring data reduction.
§ 63.9(a)-(b) Notification Requirements Yes
§ 63.9(c) Request for Compliance Extension No Compliance extension to not apply to new or reconstructed sources.
§ 63.9(d) Notification of Special Compliance Requirements for New Sources Yes
§ 63.9(e) Notification of Performance Test No Subpart PPPPP does not require performance testing.
§ 63.9(f) Notification of Opacity/VE test No Subpart PPPPP does not have opacity/VE standards.
§ 63.9(g)(1) Additional Notifications When Using CMS Yes
§ 63.9(g)(2) Additional Notifications When Using CMS No Subpart PPPPP does not have opacity/VE standards.
§ 63.9(g)(3) Additional Notifications When Using CMS Yes
§ 63.9(h) Notification of Compliance Status Yes
§ 63.9(i) Adjustment of Submittal Deadlines Yes
§ 63.9(j) Change in Previous Information Yes
§ 63.9(k) Notifications Electronic reporting procedures Yes, only as specified in § 63.9(j).
§ 63.10(a) Recordkeeping/Reporting Yes
§ 63.10(b)(1) General Recordkeeping Requirements Yes
§ 63.10(b)(2)(i) Recordkeeping of Occurrence and Duration of Startups and Shutdowns Yes before December 1, 2020. No on and after December 1, 2020
§ 63.10(b)(2)(ii) Recordkeeping of Occurrence and Duration of Malfunctions Yes before December 1, 2020. No on and after December 1, 2020 See § 63.9355 for recordkeeping of (1) date, time, and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
§ 63.10(b)(2)(iii) Recordkeeping of Maintenance on Controls and Monitoring Equipment Yes
§ 63.10(b)(2)(iv)-(v) Actions Taken to Minimize Emissions During SSM Yes before December 1, 2020. No on and after December 1, 2020
§ 63.10(b)(2)(vi)-(xi) CMS Records Yes
§ 63.10(b)(2)(xii) Records Yes
§ 63.10(b)(2)(xiii) Records Yes
§ 63.10(b)(2)(xiv) Records Yes
§ 63.10(b)(3) Recordkeeping for Applicability Determinations Yes
§ 63.10(c)(1)-(6), (9)-(14) Additional Recordkeeping for CMS Yes
§ 63.10(c)(7)-(8) Records of Excess Emissions and Parameter Monitoring Exceedances for CMS No Specific language is located at § 63.9355 of subpart PPPPP.
§ 63.10(c)(15) Records Regarding the SSM Plan Yes before December 1, 2020. No on and after December 1, 2020
§ 63.10(d)(1) General Reporting Requirements Yes
§ 63.10(d)(2) Report of Performance Test Results Yes
§ 63.10(d)(3) Reporting of Opacity or VE Observations No Subpart PPPPP does not have opacity/VE standards.
§ 63.10(d)(4) Progress Reports for Sources with Compliance Extensions No Compliance extensions do not apply to new or reconstructed sources.
§ 63.10(d)(5) SSM Reports Yes before December 1, 2020. No on and after December 1, 2020 On and after December 1, 2020, see § 63.9350 for malfunction reporting requirements.
§ 63.10(e)(1) and (2)(i) Additional CMS Reports Yes
§ 63.10(e)(2)(ii) Additional CMS Reports No Subpart PPPPP does not require COMS.
§ 63.10(e)(3) Excess Emissions/CMS Performance Reports No Specific language in located in § 63.9350 of subpart PPPPP.
§ 63.10(e)(4) COMS Data Reports No Subpart PPPPP does not require COMS.
§ 63.10(f) Waiver for Recordkeeping/Reporting Yes
§ 63.11 Control Device Requirements/Flares No Subpart PPPPP does not specify use of flares for compliance.
§ 63.12 State Authority and Delegations Yes
§ 63.13 Addresses Yes
§ 63.14 Incorporation by Reference Yes ASTM D 6522-00 and ANSI/ASME PTC 19.10-1981 (incorporated by reference—See § 63.14).
§ 63.15 Availability of Information/Confidentiality Yes