40 CFR Table B-4 to Subpart B of Part 53: Table B-4 to Subpart B of Part 53—Line Voltage and Room Temperature Test Conditions
Where this section sits in the code
- Title 40—Protection of Environment
- CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY
- SUBCHAPTER C—AIR PROGRAMS
- PART 53—AMBIENT AIR MONITORING REFERENCE AND EQUIVALENT METHODS
- Subpart B—Procedures for Testing Performance Characteristics of Automated Methods for SO2, CO, O3, and NO2
Test day Line voltage,1 rms Room temperature,2 °C Comments
0 115 25 Initial set-up and adjustments.
1 125 20
2 105 20
3 125 30 Adjustments and/or periodic maintenance permitted at end of tests.
4 105 30
5 125 20
6 105 20 Adjustments and/or periodic maintenance permitted at end of tests.
7 125 30 Examine test results to ascertain if further testing is required.
8 105 30
9 125 20 Adjustments and/or periodic maintenance permitted at end of tests.
10 105 20
11 125 30
12 105 30 Adjustments and/or periodic maintenance permitted at end of tests.
13 125 20
14 105 20
15 125 30
1 Voltage specified shall be controlled to ±1 volt.
2 Temperatures shall be controlled to ±1 °C.
Collected 2026-08-27T02:26:04Z. Source file · JSON