41 CFR 101-27.206-2: -27.206-2 Identification and shipping requirements.
Where this section sits in the code
- Title 41—Public Contracts and Property Management
- Subtitle C—Federal Property Management Regulations System
- CHAPTER 101—FEDERAL PROPERTY MANAGEMENT REGULATIONS
- SUBCHAPTER E—SUPPLY AND PROCUREMENT
- PART 101-27—INVENTORY MANAGEMENT
- Subpart 101-27.2—Management of Shelf-Life Materials
Manufacturers shall, whenever practicable, be required to mark the unit or container with the month and year of manufacture or production and the batch number on all shelf-life items (60 months or less) procured from other than GSA sources. Whenever practical, the supplier shall be required to ship or deliver material within a given number of months from the date of manufacture or production. These “age on delivery” requirements should not be imposed in such a manner as to unduly restrict competition at any trade level. The following guidelines are suggested as appropriate for most shelf-life items:
Shelf-life period Age on delivery
25 mos. or more 6 mos.
19 to 24 mos 4 mos.
13 to 18 mos 3 mos.
7 to 12 mos 2 mos.
6 mos. or less 1 mo. or less.
Collected 2026-08-27T02:26:05Z. Source file · JSON