GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

41 CFR 101-27.206-2: -27.206-2 Identification and shipping requirements.

Read at publisher ↗
Where this section sits in the code
  1. Title 41—Public Contracts and Property Management
  2. Subtitle C—Federal Property Management Regulations System
  3. CHAPTER 101—FEDERAL PROPERTY MANAGEMENT REGULATIONS
  4. SUBCHAPTER E—SUPPLY AND PROCUREMENT
  5. PART 101-27—INVENTORY MANAGEMENT
  6. Subpart 101-27.2—Management of Shelf-Life Materials

Manufacturers shall, whenever practicable, be required to mark the unit or container with the month and year of manufacture or production and the batch number on all shelf-life items (60 months or less) procured from other than GSA sources. Whenever practical, the supplier shall be required to ship or deliver material within a given number of months from the date of manufacture or production. These “age on delivery” requirements should not be imposed in such a manner as to unduly restrict competition at any trade level. The following guidelines are suggested as appropriate for most shelf-life items:

Shelf-life period Age on delivery

25 mos. or more 6 mos.

19 to 24 mos 4 mos.

13 to 18 mos 3 mos.

7 to 12 mos 2 mos.

6 mos. or less 1 mo. or less.

Collected 2026-08-27T02:26:05Z. Source file · JSON

Browse this collection