43 CFR 3262.10: What operational requirements must I meet when drilling a well?
Where this section sits in the code
- Title 43—Public Lands: Interior
- Subtitle B—Regulations Relating to Public Lands
- CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER C—MINERALS MANAGEMENT (3000)
- PART 3200—GEOTHERMAL RESOURCE LEASING
- Subpart 3262—Conducting Drilling Operations
(a) When drilling a well, you must:
(1) Keep the well under control at all times by:
(i) Conducting training during your operation to maintain the capability of your personnel to perform emergency procedures quickly and effectively;
(ii) Using properly maintained equipment; and
(iii) Using operational practices that allow for quick and effective emergency response.
(b) You must use sound engineering principles and take into account all pertinent data when:
(1) Selecting and using drilling fluid types and weights;
(2) Designing and implementing a system to control fluid temperatures;
(3) Designing and using blowout prevention equipment; and
(4) Designing and implementing a casing and cementing program.
(c) Your operation must always comply with the requirements of § 3200.4.
Collected 2026-08-27T02:26:15Z. Source file · JSON