GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

43 CFR 3264.12: What must I submit to BLM after I abandon a well?

Read at publisher ↗
Where this section sits in the code
  1. Title 43—Public Lands: Interior
  2. Subtitle B—Regulations Relating to Public Lands
  3. CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR
  4. SUBCHAPTER C—MINERALS MANAGEMENT (3000)
  5. PART 3200—GEOTHERMAL RESOURCE LEASING
  6. Subpart 3264—Reports—Drilling Operations

Send us a well abandonment report within 30 days after you abandon a well. If you plan to restore the site at a later date, you may submit a separate report within 30 days after completing site restoration. The well abandonment report must contain:

(a) A complete chronology of all work done;

(b) A description of each plug, including:

(1) Type and amount of cement used;

(2) Depth that the drill pipe or tubing was run to set the plug;

(3) Depth to top of plug; and

(4) If the plug was verified, whether it was done by tagging or pressure testing; and

(c) A description of surface restoration procedures.

Collected 2026-08-27T02:26:15Z. Source file · JSON

Browse this collection