43 CFR 3809.431: When must I modify my plan of operations?
Where this section sits in the code
- Title 43—Public Lands: Interior
- Subtitle B—Regulations Relating to Public Lands
- CHAPTER II—BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR
- SUBCHAPTER C—MINERALS MANAGEMENT (3000)
- PART 3800—MINING CLAIMS UNDER THE GENERAL MINING LAWS
- Subpart 3809—Surface Management
You must modify your plan of operations when any of the following apply:
(a) Before making any changes to the operations described in your approved plan of operations;
(b) When BLM requires you to do so to prevent unnecessary or undue degradation; and
(c) Before final closure, to address impacts from unanticipated events or conditions or newly discovered circumstances or information, including the following:
(1) Development of acid or toxic drainage;
(2) Loss of surface springs or water supplies;
(3) The need for long-term water treatment and site maintenance;
(4) Repair of reclamation failures;
(5) Plans for assuring the adequacy of containment structures and the integrity of closed waste units;
(6) Providing for post-closure management; and (7) Eliminating hazards to public safety.
Collected 2026-08-27T02:26:15Z. Source file · JSON