GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 112.20-5: -5 Failure of power from the normal source or final emergency power source.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—ELECTRICAL ENGINEERING
  4. PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS
  5. Subpart 112.20—Emergency Systems Having a Temporary and a Final Emergency Power Source

(a) If there is a reduction of potential of the normal source by 15 to 40 percent, the loads under § 112.15-1 must be automatically supplied from the temporary emergency power source.

(b) For systems in which a reduction of frequency of the normal source or final emergency power source adversely affects the emergency system and emergency loads, there must be means to transfer the loads under § 112.15-1 to the temporary emergency power source upon a reduction in the frequency of the normal source or final emergency power source.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection