GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 112.55-10: -10 Storage battery charging.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER J—ELECTRICAL ENGINEERING
  4. PART 112—EMERGENCY LIGHTING AND POWER SYSTEMS
  5. Subpart 112.55—Storage Battery Installation

(a) Each storage battery installation for emergency lighting and power, and starting batteries for an emergency diesel or gas turbine driven generator set, must have apparatus to automatically maintain the battery fully charged.

(b) When the ship's service generating plant is available, the battery must have a continuous trickle charge, except that after discharge the battery must be charged automatically at a higher rate.

(c) Charging operations must not cause an absence of battery power.

(d) There must be instruments to show the rate of charge.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection