GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 160.024-3: -3 Materials, workmanship, construction, and performance requirements.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL
  4. PART 160—LIFESAVING EQUIPMENT
  5. Subpart 160.024—Pistol-Projected Parachute Red Flare Distress Signals

(a) Materials. The materials used in pistol-projected parachute red flare distress signals shall conform strictly to the specifications and drawings submitted by the manufacturer and approved by the Commandant. In general, all metallic parts shall be corrosion-resistant or properly protected against corrosion.

(b) Workmanship. Pistol-projected parachute red flare distress signals shall be of first class workmanship and shall be free from imperfections of manufacture affecting their appearance or that may affect their serviceability.

(c) Construction. The exterior case of the cartridge shall be made of suitable metal and shall protect against the entrance of moisture. The projectile case and delay element shall be so constructed as to prevent any possibility of the propelling charge blowing by and causing premature ejection of the projectile contents. The shoulder of the base of the cartridge shall be between 2.29 mm (0.090 in.) and 2.67 mm (0.015 in.) in thickness. The centered primer shall be set below the surface of the base between 0.25 mm (0.010 in.) and 0.50 mm (0.020 in.).

(d) Performance. Signals shall meet all of the inspection and test requirements contained in § 160.024-4.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection