46 CFR 160.072-09: -09 Manufacturer notification.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL
- PART 160—LIFESAVING EQUIPMENT
- Subpart 160.072—Distress Signals for Boats, Orange Flag
(a) Each manufacturer certifying flags in accordance with the specifications of this subpart must send written notice to the Commandant (CG-ENG), Attn: Office of Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue, SE., Washington, DC 20593-7509;
(1) Within 30 days after first certifying a flag,
(2) Every five years as long as the manufacturer continues to produce flags, and
(3) Each time the design or construction material of the flag changes.
(b) [Reserved]
Collected 2026-08-27T02:26:22Z. Source file · JSON