46 CFR 160.076-17: -17 Approval of design or material changes.
Where this section sits in the code
- Title 46—Shipping
- CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
- SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL
- PART 160—LIFESAVING EQUIPMENT
- Subpart 160.076—Inflatable Recreational Personal Flotation Devices
(a) The manufacturer must submit any proposed changes in design, material, or construction to the recognized laboratory and the Commandant for approval before changing PFD production methods.
(b) Determinations of equivalence of design, construction, and materials may be made only by the Commandant or a designated representative.
Collected 2026-08-27T02:26:22Z. Source file · JSON