GroundRules
← Search the law
Federal regulations · Through 2026-08-25 · Newer source version available

46 CFR 162.161-9: -9 Procedure for approval.

Read at publisher ↗
Where this section sits in the code
  1. Title 46—Shipping
  2. CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY
  3. SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL
  4. PART 162—ENGINEERING EQUIPMENT
  5. Subpart 162.161—Fixed Clean Agent Fire Extinguishing Systems

(a) Preapproval review is required as detailed in 46 CFR 159.005-5 and 159.005-7.

(b) Applications for approval must be submitted in accordance with 46 CFR 159.005-9 through 159.005-12 to the Commandant (CG-5214). In addition to the listed requirements:

(1) Evidence must be shown that an acceptable follow-up factory inspection program is in place in each factory location. This could be demonstrated by providing an original copy of the contract for a follow-up program between the manufacturer and the independent laboratory. The follow-up program must include provisions that prohibit changes to the approved equipment without review and approval by the independent laboratory.

(2) Two design, installation, operation and maintenance manuals must be submitted.

Collected 2026-08-27T02:26:22Z. Source file · JSON

Browse this collection